CS Project with no ref equipment
CS-v4 EAc6:Enhanced refrigerant managementposted by Martin Stowell on
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen
Fluorescent Light Tubes and Donation of Equipment
CI-2009 MRc2:Construction waste managementposted by Joseph Sneed on
I have two questions: I would like to confirm that the weight of fluorescent tubes that I recycled are to be added to total weight calculations used for MR2 although they don't weigh much.
SSc5.1 or SSc5.2
NC-2009 SSc5.2:Site development - maximize open spaceposted by Sheryl Swartzle on
My project is a Hotel in urban area with almost a zero lot line. The owner purchased fifteen 25 ft.
Composting
EBOM-v4 MRc4:Solid waste management - ongoingposted by Claire Bannister on
Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?
Option 3: Determining HC and NOx emissions
EBOM-v4 SSc5:Site managementposted by Michelle Raigosa on
Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?
Master's Research Survey
NC-2009 MRc7:Certified woodposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
LEED management for multi-prime contractor project
NC-2009 MRc4:Recycled contentposted by Chris Gutsche on
We have a LEED 2009 institutional project with 12 prime contractors. There is a construction management entity with oversight of the 12 primes.
Group projects w/ DES / central plants
CS-2009 EAp2:Minimum energy performanceposted by Stacey Olson on
This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in
Spray Foam Insulation
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Claire DeCamp on
I recently had a project manager approach me concerning spray foam insulation that has been specified on a project.
Preferred Parking
Retail-NC-v2009 SSc4:Alternative transportationposted by Kevin Flynn on
The LEED NC-Retail v2009 credit 4.3 and 4.4 to provide preferred parking for LEV/FE vehicles and Carpools appears to require that the project identify employee parking separate from customer parkin