Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Trane TRACE's 40 plant limit.

Schools-2009 EAp2:Minimum energy performance
posted by  Kelsey Rightmer  on 

The school I am modeling has a vrf system served by dedicated outdoor air energy recovery units as well as packaged rooftop units.

1
Tue Jul 19, 2016, 4:32 pm

Exterior doors in meeting rooms

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Jeannie Rueter  on 

The conference center I'm working on has several small meeting rooms that have interior and exterior doors with the exterior doors leading to open public terraces.

1
Wed Oct 5, 2016, 3:31 pm

Canopy to building with wall opening (is it a "complete bldg")?

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Lee  on 

We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.

1
Fri Nov 27, 2015, 3:52 am

feedback

Pilot-Credits EApc65:Monitoring based commissioning
posted by  emily reese moody  on 

There was some confusion at the on start of the process as to who owned the analyzing and reporting of the data.

0

Elementary School

NC-v4 EAp2:Minimum energy performance
posted by  K Nakamura  on 

Is there any special considerations for a project registered (v2.2) and designed 10 years ago is now being constructed. V2.2 and v2009 have expired so we need to register it for v4.

1
Wed Mar 15, 2017, 1:25 pm

Option 1 - ASE and the 10% LEED requirement

CI-v4 EQc7:Daylight
posted by  Alain Brierley  on 

I am working on a large three story office building and analyzing it to see how it would preform under Option 1 requirements.

1
Tue Jan 17, 2017, 7:23 pm

LEEDv4- Schools, LTc6 Bicycle Facilities

NC-v4 LTc6:Bicycle facilities
posted by  Karly Michalowski  on 

I have a LEEDv4 for Schools project where all students, staff and facility live on campus. Would dormitory showers count towards this credit?

1
Thu Jun 8, 2017, 1:38 pm

Energy Modeling Requirements

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Jeff Halliwell  on 

On LEED V4, ID+C Commercial Interiors:Retail, is there an option to use the California Title 24 as the calculation method or do you have to use ASHRAE 2010?

0

Bus service in opposite directions

Healthcare-v4 LTc5:Access to quality transit
posted by  Bryan Finnegan  on 

The credit requires "Qualifying transit routes must have paired route service (service in opposite directions)" We have two transit routes that run within the required distance of an entry, but th

1
Wed May 25, 2016, 1:49 am

Existing Biofuel Station on Campus

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  GTF CPRE  on 

Our project is on a university campus that has an existing biofuel station for fleet vehicles.

1
Thu Apr 2, 2015, 6:03 pm