Forum quick links
Shuttle Service
CI-2009 SSc3.1:Alternative transportation - public transportation accessposted by Kalyan Nishtala on
Hi, To achieve this credit for our project, providing a shuttle service is the only way. I have a couple of question regarding the same: 1.
EQc5 & Fume Hoods
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Laura Eubanks on
In order to meet EQc5 requirements, do science prep rooms have to be independently exhausted even if fume hoods are installed (given deck to deck partitions and self-closing doors are present as we
SFI vs FSC
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Leanne Conrad on
Does anyone know if GBCI will accept a Sustainable Forestry Initiative certified sourcing label instead of FSC?
DES Option 1 - Baseline System Heating Type Modeling Guidance
Healthcare-v2009 EAc1:Optimize energy performanceposted by Mike Ramos on
Hi all, I'm hoping someone can clarify how to model the ASHRAE Baseline systems in compliance with the "Treatment of District or Campus Thermal Energy in LEED v2 and LEED 2009 - Design and Constru
REACH
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Jonathan Weiss on
I see that REACH is listed as an international compliance path, what about a US based project that is using some REACH compliant materials - some specialized application flooring, for example, is m
Attachments for the Resubmission
posted by kelly ryan on
I am resubmitting a credit in response to LEED comments from the intial submission. The attachment file has been updated.
Parking for CI 2009 project - LEED project boundary
CI-2009 MPR3:Must use a reasonable site boundaryposted by Ron Dean on
If the Commercial Interior v2009 project has an existing parking that will serve its operations but no construction will be done, should it be included in the LEED project boundary? The CI project
"Categorized as an Office Space"
CS-2009 EAc1:Optimize energy performanceposted by Aaron Frantz on
We are proposing a new mixed use multi-story to be submitted under NC, v2009. The first floor will be cold dark shell space for future retail/restaurant tenants.
v4 vs v2009, Bicycle Shower Facilities Location
NC-v4 LTc6:Bicycle facilitiesposted by Miles Thorne on
Sorry for the redundancy - v3 tips offered up the following: "Remember that bicycle storage and shower facilities must be exclusive to occupants for the project, or a sufficient quantity must be p
Master's Research Survey
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.