WEp1 for Shopping Center

LEED Guidance for Campuses and Multiple Buildings
posted by  Nate Steeber  on 

Hello all, We have a shopping center interested in certification with 10 buildings.

1
Sat Jan 16, 2016, 2:13 am

Using pre-existing conditions as oppposed to existing conditions

CS-2009 SSc6.1:Stormwater design - quantity control
posted by  Mei Zhu  on 

SS C6.1 has two cases: Case 1: Sites with existing imperviousness 50% or less: Requires proposed runoff not exceeding the existing runoff. Case 2: Sites with existing imperviousness greater than 50

1
Wed Jul 27, 2016, 7:36 pm

Trace 700 Performance Summary Report

NC-2009 EAp2:Minimum energy performance
posted by  Aru Sau  on 

Is the Performance Summary Report generated by Trane Trace 700 (Ver 3.0) be enough for the LEED V4 EA credit?

1
Wed Jan 18, 2017, 4:50 pm

Emergency Lighting within Daylight Zone

CI-2009 EAc1.2:Optimize energy performance - lighting controls
posted by  William Weaver  on 

I have a scenario where the core is offset, and is tight to the building envelope on one side. As a result, the egress path around the core on this side falls within the 15' perimeter.

1
Tue Mar 22, 2016, 9:40 pm

Points awarded for reduced conditioned space

NC-v4 EAc2:Optimize energy performance
posted by  Amrit Kaur  on 

LEED V4 homes awards ( and generously) for residential projects with areas smaller than an accepted reference standard, and deducts points for residential units exceeding these standards.

1
Sat Aug 26, 2017, 12:59 pm

Confidential Projects Information Control

General forums
posted by  Sara Goenner Curlee  on 

I am working on a v2009 NC project with a client very sensitive to the confidential nature of their work. The project is indicated as private/confidential through LEED Online.

0

Existing Central Plant serving new building

NC-2009 EAp2:Minimum energy performance
posted by  Mital Patel  on 

Hello, We have an existing central plant that will be serving new building. How do we model this? Existing central plant will service one existing building and new building.

1
Tue Apr 21, 2015, 7:39 pm

Kitchen Hoods with gas make-up air unit

NC-2009 EAc1:Optimize energy performance
posted by  James Sullivan Jr.  on 

I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process?

1
Mon Jul 6, 2015, 3:43 pm

Primer for Waterproofing membrane

NC-v4 EQc2:Low-emitting materials
posted by  Leanne Conrad  on 

In the requirements for this credit, the building exterior is defined as "everything outside and inclusive of the primary and secondary weatherproofing system, such as waterproofing membranes and a

1
Mon Nov 7, 2016, 10:42 pm

500 miles or 100 miles?

EBOM-2009 MRc1:Sustainable purchasing - ongoing consumables
posted by  Becky Stumm  on 

In the credit language above, and corresponding LEED User calculator resource states manufacturing and distribution should be within 500 miles of the project, but my LEED EBOM v4 book from LEED say

1
Mon Jan 30, 2017, 4:59 pm