Forum quick links
Residential on a university campus.
NC-v4 LTc4:Surrounding density and diverse usesposted by Peter Doo on
How are student residence halls classified on a college campus?
Lighting Controls in Jewelry Store
Retail-CI-v2009 EAc1.2:Optimize energy performance - lighting controlsposted by Luke Wild on
We are working on a LEED project for a jewelry store which has millwork with lighting in it all around the store.
Bike stor. and shower facility sharing between NON LEED and LEED
Schools-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Amoy McGhee on
The school project we are working on has bicycle storage but no shower facility provided. This school is also connected to a NON-LEED building that has gymnasium.
preventive maintenance program
EBOM-2009 WEc2:Additional indoor plumbing fixture and fitting efficiencyposted by Kimberly Hosken on
I am certifying a project following the "streamlined path" as the building was certified LEED Gold NC 2.2.
Duct Testing and Cleaning
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Ramon Ramos on
What is the criteria for triggering duct testing and cleaning reports for both plans?
Crawl Space Inquiry
NC-2009 PIf2:Project Summary Detailsposted by Sara Zoumbaris on
Should a crawl space be included in the GSF of a project if it's completely empty (not hosting any mechanical equipment?) If the crawl space DOES have mechanical equipment within it, should it be i
Commissioning Starting After 50% CDs
NC-2009 EAc3:Enhanced commissioningposted by Sara Zoumbaris on
I could have sworn there was an LI (LEED Interpretation) discussing / approving a certain scenario where Enhanced Commissioning had been started after 50% CDs and was still acceptable under this cr
phases of project & VOCs
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Debra a. Lombard on
we are a GC working on a project that is the renovation of a historic bldg and that renovation started a very long time ago '(about 3 yrs ago) and about a year before the project was registered for
No Tenant Fit Out
CS-2009 IEQc8.1:Daylight and views - daylightposted by Kimberlyn Caoagas on
I'm working on a 12-story office building. To my knowledge, there are no concrete tenant fit outs yet (since the tenants have yet to be known). Would the project be able to pursue IEQc8.1/8.2?
Does mech engineer need to be PE to sign the "signature' box ?
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Matt Dem on
Shall the person who enters his/her initials under signatory section ( for example IEQp1 or EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ?