500 miles or 100 miles?
EBOM-2009 MRc1:Sustainable purchasing - ongoing consumablesposted by Becky Stumm on
In the credit language above, and corresponding LEED User calculator resource states manufacturing and distribution should be within 500 miles of the project, but my LEED EBOM v4 book from LEED say
Rooftop smoking areas?
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Sara Neff on
How is the 25' radius applied when the smoking area is on a rooftop? Do we assume the smoke drifts up or do I need to worry about windows below the smoking area?
R-Value for wall assembly
NC-2009 EAp2:Minimum energy performanceposted by Sunil S on
I am working on a residential building, the exterior wall assembly as R-19 fill cavity between studs for an 3.5" depth (wood studs 2x4 16" OC) but in the ASHRAE table A3.4, there is no value menti
Site adjacent to 5 lane highway - with no On-0ff ramp.
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Joyce Kelly on
If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo
v09 Water Use Reduction Additional Guidance available
NC-2009 WEp1:Water use reductionposted by RETIRED on
As part of the October 2016 LEED addenda update (http://www.usgbc.org/articles/leed-addenda-update-october-2016), USGBC updated the Water User Reduction Guidance document to Version 9 (http://www.u
data center equipment not listed in DOE Energy Star categories
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Gail Napell on
Servers are listed on the Energy Star website, but not receivers. Is it safe to assume they are still not Energy Star eligible?
Contacting the USGBC and Combining Tenant Spaces
CI-2009 PIf1:Minimum Program Requirementsposted by CHRISTIAN LUTJEN on
Hello, we have been trying to get an answer from the USGBC for two days short of a full month now.
Total Site Area within LEED Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by Sara Goenner Curlee on
I feel like I should know this, but can someone confirm for me whether or not the building footprint is included in the Total Site Area?
recessed walk off mat
EBOM-2009 IEQc3.5:Green cleaning - indoor chemical and pollutant source controlposted by Bomin Kim on
We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.
Fabricator's location
NC-2009 MRc5:Regional materialsposted by Mahsa Nicknam on
IF the manufacturer's location is within 500 miles however fabricator's location is not, does it still have contribution to this credit OR not? In another word, when manufacturer location is withi