Forum quick links
Equipment Baseline
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by LUCY WILLIAMS on
Our team is considering pursuing this credit, but it is unclear what baseline the specified equipment is to be measured against.
Daylight Measurements disappointing
NC-2009 IEQc8.1:Daylight and views - daylightposted by Joyce Kelly on
1.Measurements were disappointing July 15 because shading structures are doing their job and blocking direct sunlight - a blessing in Southern Arizona. Should we wait until the nx.
Concrete coating
CI-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Katie Diedrich on
Currently working on a job which is under Commercial Interiors v2009. There is an existing concrete floor which is going to be sealed. Which coating type would this need to be classified as?
Previously Submitted Documentation
CI-2009 PIf5:Previously LEED Certified Detailsposted by CHRISTIAN LUTJEN on
Hello, we are embarking on a new LEED 2009 C.I. project in a building that has already achieved a LEED Gold rating for Core and Shell.
Prefinished wood flooring
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Brianna Brandsen on
when installing prefinished wood flooring in a building that is attempting LEED certification, does the finish need to be compliant with LEED regulations, as you are not applying the finish on site
Project Building Context
NC-2009 PIf2:Project Summary Detailsposted by Deirdre Espiritu on
Where can I find guidance on what density is considered Urban or SubUrban?
Dynamic Glazing for IDC ?
NC-v4 INc1:Innovationposted by Sriranjani Ramachandran on
Can anyone claim points under the Innovation in Design Credit-Path 1 for using dynamic Glazing in the project?
Fenestration U-value: Framed versus Center-of-Glass
NC-2009 EAc1:Optimize energy performanceposted by Paul Cimaglia on
I received a review comment requesting confirmation that my modeled fenestration U-value accounts for framing. I'm having a difficult time contacting the window manufacturer.
MPR3 - Hotel in Mixed Use Building
CI-2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants.
short term bicycle storage
NC-v4 LTc6:Bicycle facilitiesposted by sue bryant on
Can this be located inside a building as long as it is within 100' of the main entrance?