Forum quick links
Number of signs required to be considered "comprehensive"
NC-2009 IDc1:Innovation in designposted by Kristin Walsh on
I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.
Can the credit be use within the Campus Approach
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Luis Huertas on
Can this credit be used at a campus, if all the buildings are being built at the same time within the same Master Site?
MRpc112 - Certified Multi-attribute Products and Materials
CI-2009 IDc1:Innovation in designposted by Maki San Miguel Paulson on
We have registered for this Pilot credit, but I don't understand the credit language. We have Level 3 BIFMA certified product (Knoll furniture) which is worth about 12% of the total product cost.
Mechanical Boundary Differs from Overall Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by John Havenstrite on
I am working on a project where the architectural work includes "facelift" work with no HVAC upgrades in roughly half of the scope.
Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
Environmental Product Declaration cost markup
posted by Helene Lefkowitz on
I am working on a v4 project and am trying to compare the price of materials with environmental product declarations (EPDs) vs. materials without EPDs.
Determining Site Boundary on Renovations/Additions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Buck on
We are working on a Hotel that is both a renovation and major new construction.
School Facilities
CI-2009 SSc2:Development density and community connectivityposted by Neil Rosen on
Can the athletic fields, tennis courts etc at a local high school be considered a park under CI V3 SS C2 - Community Connectivity?
Concrete Regional and Recyle Content
NC-2009 MRc5:Regional materialsposted by Rick Alfandre on
I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th
LEED ND v3 Examination End Date
posted by Michael McElroy on
According to an update posted May 15 to http://www.usgbc.org/articles/leed-v4-credential-exams-coming-june-2014 "Exams for the LEED Green Associate, BD+C, ID+C and O+M will feature v4 content in J