Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Susan Di Giulio on
We have a project on a university campus. The university maintains the roads on the campus, although there is public access 24/7.
Food Service Equipment
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Rachel Manoguerra on
I am working on a LEED for Healthcare v2009 project, and I'm wondering if I have to track food service equipment?
"Preserve from development activity 40% of the greenfield area"
NC-v4 SSc2:Site development - protect or restore habitatposted by Natalie Otoole on
Our 5 acre site has no greenfield area- we are demolishing the entire site and will restore with some green space/vegetation after construction.
CS Project with no ref equipment
CS-v4 EAc6:Enhanced refrigerant managementposted by Martin Stowell on
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen
Fluorescent Light Tubes and Donation of Equipment
CI-2009 MRc2:Construction waste managementposted by Joseph Sneed on
I have two questions: I would like to confirm that the weight of fluorescent tubes that I recycled are to be added to total weight calculations used for MR2 although they don't weigh much.
SSc5.1 or SSc5.2
NC-2009 SSc5.2:Site development - maximize open spaceposted by Sheryl Swartzle on
My project is a Hotel in urban area with almost a zero lot line. The owner purchased fifteen 25 ft.
Composting
EBOM-v4 MRc4:Solid waste management - ongoingposted by Claire Bannister on
Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?
Option 3: Determining HC and NOx emissions
EBOM-v4 SSc5:Site managementposted by Michelle Raigosa on
Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?
Master's Research Survey
NC-2009 MRc7:Certified woodposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
LEED management for multi-prime contractor project
NC-2009 MRc4:Recycled contentposted by Chris Gutsche on
We have a LEED 2009 institutional project with 12 prime contractors. There is a construction management entity with oversight of the 12 primes.