posted by Kelsey Jensen on
When compiling the list of requirements for this policy I was wondering if there is a specific goal that must be met to be considered "low emissions" for maintenance equipment?
open grid paving and gravel
NC-2009 SSc7.1:Heat island effect - nonroofposted by Erin Holdenried on
What qualifies as "open grid paving"? Can a gravel bed designed to be 50% pervious qualify as "open grid paving"? Thanks
Rainwater Management question
Schools-NC-v4 SSc4:Rainwater managementposted by Karen Darley on
What is acceptable for 10 years historical data-is it necessary to enter daily rainfall for 10 years-or can average monthly for each of the 10 years-enter annual?
Design Engineer for EAp1 and CxA for EAc3
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by Amy Harmon on
I've got a new building that is less than 50,000 SF.
ERV serving 3 different tenants
CS-2009 IEQc1:Outdoor air delivery monitoringposted by Kristopher Lashley on
We have a project where the building is three separate retail tenants all being served by a single ERV that is supplying 100% of the space outdoor air.
want to get information about previous LEED certified projects
NC-2009 PIf2:Project Summary Detailsposted by Amir Salehi on
Hello dear professionals, I have got a question and that is it: How can I find detail information about some specific LEED certified projects, I want each project scorecards in detail(for example,
Determining site area on lot with multiple buidings
Mid-Rise-v4 SSc2:Rainwater managementposted by Phil Vanderloo on
Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.
Project diversion rate v. facility rate
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Deborah Ebersole on
If a project's diversion rate is greater than 75% but the RCI certified facility's diversion rate is less than 75% during project construction is the project still eligable to achieve all MRc2 poin
Number of Products
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hello there, For option 1, how many products would a workstation, with a privacy screen and storage attached be considered?
video conferencing equipment
CI-2009 EAp2:Minimum energy performanceposted by Kristen Magnuson on
Our project has several pieces of video conferencing equipment (not just display screens), which are not ENERGY STAR certified.