Enhanced Cx -CxA in an Integrated Project Delivery IFOA format?
CI-2009 EAc2:Enhanced commissioningposted by Margaret Montgomery on
In a contractual situation where the contractor, owner and architect are bound in a single contract, who is able to hire the CxA for enhanced commissioning?
Environmental Product Declaration cost markup
posted by Helene Lefkowitz on
I am working on a v4 project and am trying to compare the price of materials with environmental product declarations (EPDs) vs. materials without EPDs.
Determining Site Boundary on Renovations/Additions
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Andrew Buck on
We are working on a Hotel that is both a renovation and major new construction.
School Facilities
CI-2009 SSc2:Development density and community connectivityposted by Neil Rosen on
Can the athletic fields, tennis courts etc at a local high school be considered a park under CI V3 SS C2 - Community Connectivity?
Task Lights in Scope
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Jonathan Weiss on
Our owner is trying to save money, and we're trying to reduce plug loads by discouraging task lighting except where needed.
Sculpture Lighting
CI-2009 EAc1.1:Optimize energy performance - lighting powerposted by Kristopher Croghan on
Our client is looking at a sculpture for an LEED CI space. The sculpture is made from wire and LED lighting.
Phasing Multiple LEED Projects
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
We are working on a development where the project site is composed of two adjacent parcels of land.
Hardscape covered by building.
NC-2009 SSc7.1:Heat island effect - nonroofposted by Robert Webber on
I'm working with a team on a hotel project, which is a highrise in a dense urban environment (100% of the site is covered by the building).
ITE for elementary school with half day students
Schools-2009 SSc4.4:Alternative transportation - parking capacityposted by April Brown on
In the ITE study calcs, does it make sense to only count the number of students in the building at one time.
Group Project - WEp1 & WEc3
Healthcare-v2009 WEp1:Water use reductionposted by Emily Hope on
In group projects, the WEp1 form requires data to be submitted separately for each project building.