Forum quick links
Information on denied credits?
posted by Stephen Buonopane on
Has USGBC/GBCI ever published any studies of denied credits? Typical total number for a project?
Changing Innovative Design Credits during Review Process
posted by Ralph Bicknese on
We are in the process of submitting a project for LEED construction credit documentation.
v2009 Project to comply using Building Automation System?
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Sara Greenwood on
Hello, I do not see any feedback on the use of incorporating a building automation system where building users can inform the building engineer to change light levels or temperature by calling or m
Master's Research Survey
Pilot-Credits MRpc76:Material ingredient reportingposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
Exemplary Performance - Unobstructed View
NC-2009 IEQc8.2:Daylight and views - viewsposted by Erin Holdenried on
I am having a hard time understanding the criteria for "unobstructed view". Does it have to do with interior space layout and the depth of the space in relation to the exterior window? Thanks
Additions While Project is in Certification Review Process
Schools-2009 PIf2:Project Summary Detailsposted by Robert Fiala on
We have a large school project (340,000 sf) that has been submitted for the design phase review and all design phase points are reviewed and marked as anticipated.
simple box model
NC-v4 IPc1:Integrative processposted by Courtney Royal on
how do you define a simple box model? for example, do you need to model thermal zones, etc.
ETS During Construction
NC-v4 EQp2:Environmental tobacco smoke controlposted by L W on
Does the ETSC prerequisite apply during construction as well?
Fraction use of FSC materials
NC-2009 MRc7:Certified woodposted by Lilian Seow on
This question and answer come from above and Missing Manual: A product has FSC-certified veneer, but a non-certified core. Can we prorate the MRc7 contribution of this product based on the cost of
Dormitory Views
NC-v4 EQc8:Quality viewsposted by Ryan White on
Hello, We are working on a dormitory and our window sills in the units are at 44" or 46". The view range is obviously 30"-90" aff but it also states specifically the 42" eye height.