Interpretation for Underground Stormwater Retaining System
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Candice Rogers on
Good morning - We have a project that is greenfield.
PV system on Conference Center
Pilot-Credits EApc56:Renewable energy - distributed generationposted by Patrick Cellie on
Hi, a Conference Center seeking recertification under EBOM v2009 has an installed PV system that seems to have all the requirements of the pilot credit: - the building doesn't use any of the ener
LEED HC 2009 - IEQc8.1 Daylight
Healthcare-v2009 IEQc8.1:Daylight and views - daylightposted by Christie Morris-Withers on
In order to get this credit it appears that all windows with "high-contrast situations" must have glare control devices. Are these devices also required to be view-preserving and automated?
Using VAV box CFMs as measurement of outside airfow
EBOM-2009 IEQc1.2:Indoor air quality best management practices - outdoor air delivery monitoringposted by Sean Blaevoet on
Will GBCI accept monitoring of VAV box CFMs as measurement of outside airflow during "economizer" mode?
Heat pump water heater
CS-v4 EAc6:Enhanced refrigerant managementposted by Ammon Palmer on
We are using a heat pump type water heater. The refrigerant capacity for the unit is over the 0.5 lb threshold.
LEED v4 CI , E&A :AEDG 50% requirements
CI-v4 EAc2:Optimize energy performanceposted by Vinay Shekar on
The tenant space that we are looking to certify for LEED v4 CI is part of an existing building .
WEp1 for Shopping Center
posted by Nate Steeber on
Hello all, We have a shopping center interested in certification with 10 buildings.
Concrete Formwork
CS-2009 MRc5:Regional materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!
Diverse Uses within a Shopping Center
CS-v4 LTc4:Surrounding density and diverse usesposted by Frank Sherman on
The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater.
Alternative Compliance Path
Schools-2009 SSp2:Environmental site assessmentposted by timothy thomas on
I am working on a project that at the initial project team meetings and scorecard review it was indicated that the Phase 1 ESA had been done and that there were no significant issues.