Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Addition to Existing Leed EBOM Building

General forums
posted by  Max Neu  on 

Forgive me if this has been answered, I searched all over and can't find a definitive answer.

0

Regularly Occupied Space + Basement View Access

NC-2009 IEQc8.2:Daylight and views - views
posted by  Ryan Kurlbaum  on 

We are doing a zero-lot line project in NYC on a very narrow site.

1
Thu Oct 16, 2014, 12:22 pm

residents of Multi-residential project

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Yan-Chuan Chen  on 

Hi All, I am working on a multi-residential building. However, the residents number should put based on the LEED Ref. Guide or on building code?

1
Tue Jun 20, 2017, 9:18 pm

Is it OK to use different units of measurement for MRc6 + MRc7?

EBOM-2009 MRc6:Solid waste management - waste stream audit
posted by  Craig Wilson  on 

A client had a waste audit done for MRc6 in weight (36% landfill diversion) and we analyzed MRc7 in volume (55% landfill diversion).

1
Wed Jul 6, 2016, 3:54 pm

1 year contract?

NC-2009 EAc6:Green power
posted by  Erin Holdenried  on 

In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.

1
Fri May 29, 2015, 6:34 pm

100% OA Laboratory System

NC-v4 EAp2:Minimum energy performance
posted by  Charles Daze  on 

I have a HVAC system with labs on it requiring 100% outside air systems. Following all the guidance in 90.1 these spaces require a dedicated Sys 5/7 because they are over 5,000 cfm.

1
Thu Oct 6, 2016, 3:05 pm

IAQ Procedure is NOT acceptable?

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  James Keohane  on 

I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.

1
Tue Jan 24, 2017, 2:21 pm

Existing Building, Renovations Taking Place Piecemeal

CI-v4 EQc4:Indoor air quality assessment
posted by  Sara Zoumbaris  on 

We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.

1
Sat Aug 26, 2017, 6:51 pm

Garage Space - Negatively Pressurized Rooms

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Panda Aumpansub  on 

Hello there, For garage spaces that are designed for CO/NO₂ monitoring and have a neutral (Exhaust air – Supply air = 0) pressurization.

1
Wed Mar 2, 2016, 7:42 am

Athletic Track

NC-2009 SSc2:Development density and community connectivity
posted by  Erica Downs  on 

Has anyone successfully used an Athletic Track as a "fitness center" option? Definitely open the public and seems like it should fly. Thanks!

1
Tue May 16, 2017, 9:40 pm