ECB vs Appendix G
CI-2009 EAc1.3:Optimize energy performance - HVACposted by MKK LEED on
I am trying to understand whether the modelling for Option 2 of this credit is supposed to be done using the ECB method or Appendix G.
green power for residential hi-rise?
NC-2009 EAc6:Green powerposted by Seonhee Kim on
Any proven strategy pursuing green power credit for residential hi-rise project? it is a rental property with separate utility meter to each unit. Any advice would be greatly appreciated!
Well Building Standard
CI-2009 IDc1:Innovation in designposted by Susan Coy on
I am working on a LEED-CI project and we are doing documenting the project to receive the Well Building Standard certification as well.
Steel Extraction Location - Manufacturer Claim
NC-2009 MRc5:Regional materialsposted by Sara Zoumbaris on
Hi all, I am spinning my wheels second guessing what is now accepted.
Documentation for small sites without SWPPP
NC-2009 SSp1:Construction activity pollution preventionposted by Norma Lehman on
For the first year of construction, our project site area was smaller than the area that requires SWPPP inspections/reports.
Reopening one path of LEED-CI SSc1.2 in Construction Review
posted by Susan Di Giulio on
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.
Walk-off Mat Width Requirement
CI-2009 IEQc5:Indoor chemical and pollutant source controlposted by Itzel Meynard on
My project is LEED 2009 commercial interiors. I understand the entryways are required to be 10 feet in the direction of travel inside the building.
43" partitions block views and negate compliance?
EBOM-2009 IEQc2.4:Daylight and viewsposted by Vanessa Seibert on
I see that there was some conversation on the views credit back in 2011.
Baseline system for water loop heat pump in Proposed case
NC-2009 EAp2:Minimum energy performanceposted by Mayank Bhatnagar on
Hello everyone, I am working on a residential project. The proposed case HVAC system is Water loop heat pump with cooling tower and natural gas based condensing boilers.
Zero lot line
EBOM-v4 SSc5:Site managementposted by Lawrence Lile on
Can a zero lot line building achieve this credit?