Forum quick links
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
Calculations for an Elementary School
Schools-NC-v4 LTc7:Reduced parking footprintposted by Cynthia Kaplan on
We are trying to figure out how to translate our ITE calcs properly for an elementary school project.
University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.
Reuse roof joists But not roof deck
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by C. Anne Brockelman on
I am working on a renovation project of a courthouse. We will be reusing the roof joists but will remove all the existing roof deck.
Possible Exclusion??
NC-2009 IEQc8.2:Daylight and views - viewsposted by Nate Steeber on
My team has a unique project (I suppose most are) - part of it is a cheese processing facility.
Campus Project
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by P Fanfulik on
I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?
Recycling estimates from similar projects
CS-v4 MRp1:Storage and collection of recyclablesposted by Martin Stowell on
Since this is a C&S project, we need estimates for expected volume of recycling. Can you provide any guidance on where to find case studies or historical data or similar buildings?
Energy Star minimum area = 5,000sf
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Saul Pichardo, AIA on
I would like to certify a two story, 3,800 s.f. office building. When generating the Energy Star performance report one question asks to confirm that the building area is 5,000 s.f. or greater.
Pilot Credit 87: Verified C&D Recycling Rates
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by David Dixon on
have several project and have had to work with the contractors and their LEED coordinator to select a company that is verified for this credit.
Existing Conditions
NC-v4 WEp1:Outdoor water use reductionposted by Craig Graber on
This is Josef Abboud from Atelier Ten For outdoor areas within a renovation project scope (i.e.