Forum quick links
Tree grates
CS-2009 SSc7.1:Heat island effect - nonroofposted by sue bryant on
Can the metal grates used where trees are planted in a hardscape count as open paver area [as long as the 50% open grid is achieved]?
insulation thickness versus energy modeling
NC-v4 EAp2:Minimum energy performanceposted by Jennifer Webb on
We are running into a situation where the insulation is slightly under the R38 (R34.8) that is required per ASHRAE 90.1 yet the energy model shows we are over 10% energy efficient.
If you are already meeting SS c8...
Pilot-Credits SSpc55:Bird collision deterrenceposted by Cynthia Kaplan on
...Then the lighting requirements for SS pc55 should be a foregone conclusion, no?
Natatorium Locker Rooms
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Carl Karlen on
I am filing out the LEED documentation for IAQc1 for a Rec Center in St. Louis, MO. There is a Natatorium in this Rec with attached Locker/restroom/shower spaces.
ID credit for college or university
Schools-2009 IEQp3:Minimum acoustical performanceposted by Cindy Quinn on
Has anyone had luck submitting this credit and/or IEQc9 as an ID credit for a college or university?
SSpc14 Walkable Project Sites - navigating process
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
Wow. The credit makes some sense, but the process is definitely a challenge. I just spent 20 minutes trying to find the survey to complete it.
Urban setting/city block difficulties
Pilot-Credits PC14:Walkable Streetsposted by Nicholas Bristow on
When completing this pilot credit, it seems that it should give more allowances for buildings that have streets on all four sides (take up an entire city block).
Outdoor shower?
NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Cindy Quinn on
Any chance an outdoor shower with curtained off changing area would qualify in a hot, arid climate?
Captured and Conveyed to on-site retention areas
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Bridget Brock on
We are having a hard time determining how to calculate the flow quantities for our site when it has been designed so all of the run off is captured and conveyed to on-site retention ponds.
Credit Name change...
Pilot-Credits EQpc78:Design for active occupantsposted by Kath Williams on
This may have been suggested early on but this is the third project where the client and design team objected to the name of this credit.