Confusion over tile
Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Crista Shopis on
Above in the "Birds Eye View" tab, it says "Resilient flooring, rubber flooring, ceramic tile, and prefinished wood flooring all must be FloorScore or Greenguard Children and Schools certified." Bu
choosing between CS and Hospitality
posted by GBD Architects on
Hi, we have a large project coming up that will be about 43% hotel and the rest CS.
Option 1 - how to account for a structural truss in the calcs
Schools-2009 IEQp3:Minimum acoustical performanceposted by Jeremy Knoll on
In our classrooms and other core learning spaces, we are leaving a concrete, pan joist system exposed.
Pilot vs v4 Demand Response - Full Automation
Pilot-Credits EApc8:Demand responseposted by Jennifer Wehling on
I have a LEED NC 2009 project that wants to use Demand Response as an Innovation Point.
Peak Transients
Schools-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by timothy thomas on
The following is review comment I received for SS 4.2. "Refer to the comments within PIf3: Occupant and Usage Data.
Bake Out?
NC-v4 EQc3:Construction indoor air quality management planposted by Rosemary Ziemann on
Hello, Is the strategy of using a "bake out" to remove VOCs from interior building materials advisable?
The vent calcs indicate a total area significantly lessthan Plf2
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Matt Dem on
Hi, I received a comment for (Design Preliminary Submission) ventilation calculations indicate a total area (3,055 sqf) significantly less than plf2 (6219 sqf) for the IEQp1 Our response is; The ar
MRc6 Waste Audit - Weight vs. Volume
EBOM-2009 MRc6:Solid waste management - waste stream auditposted by Alexis Voeltner on
We have always conducted waste audits using weight. We are seeking a more efficient means to calculating waste and recycling; is measuring the volume more efficient?
At the discretion of the permit holder
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Ashley Hu on
Hi Everyone, here's another question. The campus guidance from the LEED Canada Reference Guide states the following: " It is acceptable to achieve a Campus Shared Infrastructure compliance path
Never Have Cooling Towers
Pilot-Credits WEpc17:Cooling tower water useposted by Janice Rogers on
We do small renovations and have never installed or replaced a cooling tower. Do I still have a "no" credit even if I can't meet the criteria of the credit because we don't have the equipment?