Any HAP Expert?
NC-2009 EAp2:Minimum energy performanceposted by Khaled Fouda on
I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.
Existing buidling assembly
Schools-2009 EAp2:Minimum energy performanceposted by soham babu on
If we are not knowing existing assembly values can we go with ASHRAE 90.1 values for existing assembly. USGBC will approve ?
Adding carpet to LEED Platinum NC building
posted by Alireza Anvari on
Hi, I'm new here and new in LEED, I apologize for my ignorance. I work as a PM in a LEED Platinum NC building. We are planning to install carpet in the top floor hall way.
Fluorescent Light Tubes and Donation of Equipment
CI-2009 MRc2:Construction waste managementposted by Joseph Sneed on
I have two questions: I would like to confirm that the weight of fluorescent tubes that I recycled are to be added to total weight calculations used for MR2 although they don't weigh much.
SSc5.1 or SSc5.2
NC-2009 SSc5.2:Site development - maximize open spaceposted by Sheryl Swartzle on
My project is a Hotel in urban area with almost a zero lot line. The owner purchased fifteen 25 ft.
Composting
EBOM-v4 MRc4:Solid waste management - ongoingposted by Claire Bannister on
Are existing buildings that are not schools still able to get a points for composting food waste? Can it be included in the calculations of ongoing solid waste?
Option 3: Determining HC and NOx emissions
EBOM-v4 SSc5:Site managementposted by Michelle Raigosa on
Although an Equipment Emissions Reduction Calculator is provided, how do we address maintenance vehicles used on site?
Master's Research Survey
NC-2009 MRc7:Certified woodposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
LEED management for multi-prime contractor project
NC-2009 MRc4:Recycled contentposted by Chris Gutsche on
We have a LEED 2009 institutional project with 12 prime contractors. There is a construction management entity with oversight of the 12 primes.
Group projects w/ DES / central plants
CS-2009 EAp2:Minimum energy performanceposted by Stacey Olson on
This is with regard to an open air shopping plaza, which is registered as a group project with 7 structures. We received guidance to follow the “Treatment of District or Campus Thermal Energy in