Is a Rollout Mat considered a permanent entryway system?
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by Tim Nabholz on
According to the language provided for the credit: "Acceptable entryway systems include permanently installed grates, grilles, slotted systems that allow for cleaning underneath, rollout mats, and
Pursuing credits in recert that were denied during intial cert
posted by Alexa Stone on
Hi LEED Experts, My question pertains specifically to two credits in the LEED v2009 EBOM rating system, SSc3 & EQ3.6. These two credits were denied during the original certification.
Integrated Project Team Members
Healthcare-v2009 IDp1:Integrated project planning and designposted by Kim Lombard on
Some of our team members have changed throughout the lengthy design and construction process of a Major Hospital.
Amphitheater Occupancy
NC-2009 WEp1:Water use reductionposted by Peter Doo on
Our project is the back stage area of a seasonal outdoor amphitheater concert venue. The venue hosts concerts 35 days per year over a 24 week period.
Looks like I’m first to post here so here goes!
Pilot-Credits EQpc85:Learning Controls for Thermal Comfortposted by Dirk Kestner on
1. Has anyone else pursued this Pilot? If so what was your experience? 2.
Multi-use project
Mid-Rise-v4 MPR2:Must use reasonable LEED boundariesposted by Vanessa Toralti on
We have a new LEED v4 Multifamily Midrise project (Homes), it’s several residential buildings on the same site.
Designated Drop-off spaces
Schools-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Matthew Heaton on
Can all preferred parking spaces for low-emitting and fuel-efficient vehicles also be carpool drop off spaces.
Innovation In Design Credits
NC-2009 IDc1:Innovation in designposted by Brian Harris on
After a design or construction submittal review, if one (or more) of the ID credits is not accepted, may it be replaced with a different ID attempt on the re-submittal? Myles Huddart LEED AP BD+C
LEED Rating System for tenant in existing building
posted by Jennifer Isaac on
My client is a pharmaceutical facility that occupies part of the area of an existing building.
green spec
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Lisa Logan on
Are green spec products allowed in place of Energy Star? If you can prove they are equivalent in energy savings?