Forum quick links
small community adjustment
NC-v4 LTc5:Access to quality transitposted by nancy picard on
For LEED 2009, there was CIR 431 from the CaGBC that adjusted frequency for communities under 50,000 people. Is there a similar adjustment acceptable for LEED v4?
Option 3 fueling capacity determined by time limit?
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Erica Downs on
Our project is at a large university, and a 2-plug Level 2 station has been installed.
LEED CI 2009 Innovation option: Monitoring Based Commissioning
CI-2009 IDc1:Innovation in designposted by Margaret Montgomery on
This option in the innovation catalog is noted as adapted from LEED v4 EAc Enhanced Cx, and I'm not clear if it would be counted as an additional above-2009-enhanced-cx strategy, or if it's somehow
walk-in closets in residential
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Alfonzo Collins on
I would like to know if there's any way I can consider walk-in closets in a residential building as unoccupied spaces.
Material Streams in New Construction
NC-v4 MRc5:Construction and demolition waste managementposted by Allison Wilson on
My best understanding is that there are five possible material diversion streams: - Commingled recycled - Donated - Recycled – source separated - Reused - Salvaged My question is this: how do you
Number of Trips
EBOM-v4 LTc1:Alternative transportationposted by JOHN COOK on
On the Alternative Transportation Calculator does " number of vehicle trips" imply one way or round trip?
Central Energy Plant and Service hot water heating
NC-2009 EAp2:Minimum energy performanceposted by ESD Engineer on
My project is a hospital building and has a central energy plant which serves the building pursuing for LEED NC certification, i am modeling the plant efficiency based off DESv2 option 2 as the pro
Scorecards are needed?
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Maki San Miguel Paulson on
1. When I registered for pilot credit 112 for LEED 2009 ID+C CI in February of 2017, there was no explicit credit documentation requirements that listed the need to obtain scorecards for each produ
Existing Envelop for Baseline case
Schools-NC-v4 EAp2:Minimum energy performanceposted by John on
I am modelling a school building where the new insulation is being added to the existing walls.
Installation of Lighting Posts
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Claire Bannister on
We are having two large solar to LED light poles installed in our parking lot. Would this be included in this Facility Maintenance & Renovation credit, as well as "Purchasing- Lamps"?