Forum quick links
Company providing Shuttle to Train Station
NC-2009 IDc1:Innovation in designposted by Joyce Kelly on
A warehouse / distribution center facility just bought a shuttle to transport employees to / from train station (more than 2 miles away.) We understand this doesn't meet the intent of SSc4.1, but i
LI ID #10421 allows 90.1-2010 for v2009 but how to document it?
NC-2009 EAp2:Minimum energy performanceposted by RETIRED on
One of my projects is considering using LI ID #10421 (http://www.usgbc.org/content/10421) that allows v2009 projects to use ASHRAE 90.1-2010 with an adjusted point scale.
Do aerosol rust-inhibitor paints fall under LEED guidelines?
NC-v4 EQc2:Low-emitting materialsposted by Debra a. Lombard on
we have steel doors that will have a very nasty primer put on in the shop that has carbon black, formaldehyde, cobalt based chemical and other nasty stuff.
System Furniture Include or Excluude?
CI-2009 IEQc8.1:Daylight and views - daylightposted by Alain Brierley on
I am working on a large 12 story office building that has a 12 story toplite open atrium requiring the credit be documented using option 1.
Energy STAR appliances - what counts
CI-v4 EAc2:Optimize energy performanceposted by emily reese moody on
Under v3, only new appliances/equipment being purchased for the project counted and had to be tracked for credit compliance. Is that still the case here?
ENERGY STAR - only newly purchased eligible products?
CI-v4 EAp2:Minimum energy performanceposted by Joanna Switzer on
Not seeing this qualified in the Reference Guide, but hoping someone can verify this is still the same as in 2009 CI....the pre-req compliance (and elective credit points under Optimize Energy) is
Innovation credit on cultural preservation
NC-2009 IDc1:Innovation in designposted by Vanessa Poirier on
Hi all, Is there any precedent of an innovation credit dealing with cultural preservation or for a project with strong emphasis on culture?
Non-composite wood with off-site applied coatings
NC-v4 EQc2:Low-emitting materialsposted by Ashley Hu on
Hello there, what would the requirements be for non-composite wood with off-site applied coatings, for example a wood screen created with 2x4 stained wood? Thank you!
definition of composite wood and tectum panels?
NC-v4 EQc2:Low-emitting materialsposted by Debra a. Lombard on
We are a GC on a 2009 NC project. our Sub is installing Tectum finale panels are made from: mineral wool (rock) and aspen trees.
Applicablility of Options for BD+C Rating System
Warehouses-NC-v4 EAp2:Minimum energy performanceposted by Mercedes Ferreira on
I noticed that three options are available for the energy performance credit: 1) whole-building energy simulation, 2) Prescriptive compliance: ASHRAE 50% Advanced Energy Design Guide, and 3) Presc