ND-Plan-v4 NPDc8:Transportation demand managementposted by William Gagnon on
Hello, Any precedents on how to integrate carsharing services such as Car2Go, Communauto or Zipcars that do not have specific restrictions on drop-off points?
NPDc4 Option 2 : how to determine price of for-sale units
ND-v4 NPDc4:Housing types and affordabilityposted by William Gagnon on
Hey-ya, We are having a hard time finding out how to calculate Option 2 : Affordable Housing, for-sale units. We read from the LEED ND v4 reference guide : ''Determine the maximum amount of incom
District Energy Cx Guidance
NC-v4 EAp1:Fundamental commissioning and verificationposted by Candice Rogers on
Hello, We have a project that meets the requirements of District Energy Systems. There is one new piece of equipment and multiple existing that will serve the facility.
MR 2.2 Form Change
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Fred Smith on
I am confused as the the new form on LEED On Line vs what you are showing on LEED User. I am not sure what is needed to upload in regards to our purchasing and criteria for sustainability.
Documented floor plans with occupancy scale
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Edgar Arevalo on
Before I began uploading the floor plans showing the controls and lighting equipment on the LEED online template for EAc1.2, I noticed that the templates requests floor plans indicated which zones
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Helene Lefkowitz on
Are CSRs required simply for manufacturer's (a blanket report that encompasses all products made by a particular manufacturer), or are CSRs required for each individual product?
Data Center CxA
NC-v4 EAp1:Fundamental commissioning and verificationposted by Peter Dishno on
The LEED V4 book has the comment: "DATA CENTERS ONLY For small projects with computer room peak cooling loads less than 2,000,000 Btu/h (600 kW) or a total computer room peak cooling load less tha
Maximum threshold for General VOC emissions compliance?
NC-v4 EQc2:Low-emitting materialsposted by Joanna Switzer on
Hi, I am not finding any info to suggest a maximum VOC limit allowable under the General Emissions. Does "5.0 mg/m3 or more" really include everything greater than 5.0mg?
No FTE
NC-v4 MPR3:Must comply with project size requirementsposted by Claire DeCamp on
We've got a building with no FTE - it houses mostly lab equipment that is managed by a researcher and then left alone. There are no restrooms, offices, etc.
Spaces controlled by both daylight and occupancy sensors
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Edgar Arevalo on
I have a project that has spaces which are controlled by both an occupancy sensor and a separate daylight sensor that is installed within 15 feet of the windows.