Forum quick links
New Materials & Resources Calculator
NC-2009 MRc5:Regional materialsposted by Tiffany Moore on
Has anyone taken a look at the new calculator (v06, Jan 4, 2016)?
Lease Language
posted by Chris Freeland on
I am trying to determine what the correct lease language should be used to qualify for the EA-1 points.
On-site exercise facilities on a corporate campus
Pilot-Credits EQpc78:Design for active occupantsposted by Sara Goenner Curlee on
My project is on a corporate campus. The corporation is a big proponent of employee health and fitness.
Classifying Floors for Re-entry
Pilot-Credits EQpc78:Design for active occupantsposted by Sara Goenner Curlee on
I received back the following as part of the review comments: "Provide signage indicating that the floors are classified for re-entry." What kind of signage are talking about?
Re-roofing by Owner was done before starting our project
NC-2009 SSc7.2:Heat island effect - roofposted by Paul Duffy on
We are renovating a university building with goal of silver certification.
Exterior Applied Products: paving and athletic surfaces
NC-v4 EQc2:Low-emitting materialsposted by Allison Zuchman on
How should exterior paving and play surfaces be addressed in the Low-Emitting credit, Exterior Applied Products product category?
100% well or non-potable water
EBOM-v4 WEc3:Cooling tower water useposted by Elizabeth Dunn on
Our building uses 100% well or non-potable water.
Achieving Innovation Design: MRc2 (95%)
NC-2009 MRc2:Construction waste managementposted by James Goldfield on
Hello Everyone, I am currently on a project where one of our goals is to achieve Innovation Design: MRc2 Exemplary Performance (95%).
Multiple Street Frontages
Pilot-Credits PC14:Walkable Streetsposted by Carrie Webster on
Our project is on a corner and has two street frontages, with the primary façade on the "main street" and one side along a side street.
Energy Recovery Bypass
NC-2009 EAp2:Minimum energy performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.