Future Alternative Compliance Paths

Pilot-Credits PC14:Walkable Streets
posted by  Douglas Flandro  on 

I would like to see some more options added to this credit to encourage walking on the project site such as tables and benches with solar powered charging stations, outdoor theaters, performance ar

2
Default Avatar
LPAS Architecture + Design
LEEDuser Basic Member
0 thumbs up
Tue Nov 8, 2016, 1:37 pm

C&D Waste Recycling Calculations for 200 yr-old bldg renovation

NC-2009 MRc2:Construction waste management
posted by  Debra a. Lombard  on 

C&D Waste Recycling Calculations for 200 yr-old bldg renovation: This 200 yr-old brick building had a tremendous amount of old brick that was falling apart and needed to be taken out and re-po

2
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Nov 4, 2016, 5:07 pm

Included wooded area in LEED boundary?

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Erica Downs  on 

The project is on a college campus, and the site itself if previously developed.

3
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Nov 3, 2016, 9:11 pm

exemplary performance

ND-v4 INc1:Innovation
posted by  Ian Scott  on 

I purchased my v4 reference guide last year and the listing of exemplary performance options differs in the table 5: Scorecard and policy areas and the information listed under each credit.

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Nov 2, 2016, 9:27 pm

CHP - Approach

NC-2009 EAp2:Minimum energy performance
posted by  Victoria Watson  on 

Hi, I have a project with a CHP and I am unsure how to model in line with requirements. It is to be constructed as part of the current project and will be in the LEED boundary.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Oct 31, 2016, 7:51 pm

Applicable spec divisions for MRc3

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Chris Sanders  on 

Using CSI divisions as a basis, does MRc3 only apply to Div. 03-10, and parts of Div. 31-32? I can't seem to find direction, although I'm sure it exists! Thanks in advance for your help.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Oct 27, 2016, 2:36 pm

Decorative Exterior Lighting

NC-2009 EAp2:Minimum energy performance
posted by  Saif Abdulameer  on 

Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.

2
ASHRAE BEMP HBDP - LEED GA, Building Performance Consultant
Zonda
LEEDuser Basic Member
14 thumbs up
Wed Oct 19, 2016, 9:57 pm

New Option - Walking Path

Pilot-Credits EQpc78:Design for active occupants
posted by  Garrett Ferguson  on 

On a LEED-CI project where the interior will be renovated, the project owner encourages walking. A walking path has been provided that overlooks an atrium and is daylit with a skylight.

2
Default Avatar
Architect
Gresham Smith & Partners
LEEDuser Basic Member
6 thumbs up
Wed Oct 19, 2016, 6:05 pm

certified wood credit

NC-2009 MRc7:Certified wood
posted by  Shawn Keith  on 

My project specs have put casework into division 12. Do I have to include these in my calcs for MR C 7?

2
Default Avatar
Kohout Woodwork, Inc
LEEDuser Basic Member
8 thumbs up
Tue Oct 18, 2016, 6:53 pm

Permanent entry way to retail space in a mid-rise multi-family

CI-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Morteza Kasmaei  on 

This is an eight-story apartment building that is pursuing LEED-NC 2009 and contains future retail spaces in the ground floor.

3
Principal
Climatic Design Inc.
LEEDuser Basic Member
18 thumbs up
Mon Oct 17, 2016, 5:29 pm