Pilot-Credits PC14:Walkable Streetsposted by Douglas Flandro on
I would like to see some more options added to this credit to encourage walking on the project site such as tables and benches with solar powered charging stations, outdoor theaters, performance ar
C&D Waste Recycling Calculations for 200 yr-old bldg renovation
NC-2009 MRc2:Construction waste managementposted by Debra a. Lombard on
C&D Waste Recycling Calculations for 200 yr-old bldg renovation: This 200 yr-old brick building had a tremendous amount of old brick that was falling apart and needed to be taken out and re-po
Included wooded area in LEED boundary?
NC-2009 SSc5.1:Site development - protect or restore habitatposted by Erica Downs on
The project is on a college campus, and the site itself if previously developed.
exemplary performance
ND-v4 INc1:Innovationposted by Ian Scott on
I purchased my v4 reference guide last year and the listing of exemplary performance options differs in the table 5: Scorecard and policy areas and the information listed under each credit.
CHP - Approach
NC-2009 EAp2:Minimum energy performanceposted by Victoria Watson on
Hi, I have a project with a CHP and I am unsure how to model in line with requirements. It is to be constructed as part of the current project and will be in the LEED boundary.
Applicable spec divisions for MRc3
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Chris Sanders on
Using CSI divisions as a basis, does MRc3 only apply to Div. 03-10, and parts of Div. 31-32? I can't seem to find direction, although I'm sure it exists! Thanks in advance for your help.
Decorative Exterior Lighting
NC-2009 EAp2:Minimum energy performanceposted by Saif Abdulameer on
Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.
New Option - Walking Path
Pilot-Credits EQpc78:Design for active occupantsposted by Garrett Ferguson on
On a LEED-CI project where the interior will be renovated, the project owner encourages walking. A walking path has been provided that overlooks an atrium and is daylit with a skylight.
certified wood credit
NC-2009 MRc7:Certified woodposted by Shawn Keith on
My project specs have put casework into division 12. Do I have to include these in my calcs for MR C 7?
Permanent entry way to retail space in a mid-rise multi-family
CI-2009 IEQc5:Indoor chemical and pollutant source controlposted by Morteza Kasmaei on
This is an eight-story apartment building that is pursuing LEED-NC 2009 and contains future retail spaces in the ground floor.