Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

GC Responsible for Implementing Option B?

NC-2009 EAc5:Measurement and verification
posted by  Marcia Weekes  on 

Does anyone have any experience with projects where a GC has been given the responsibility for implementing the M&V credit using Option B?

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Sep 8, 2016, 3:29 pm

Anti-Rust vs flat primer

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Michelle Raigosa  on 

Does anyone have any insight/thoughts/comments/experience about categorizing an anti-rust coating as compared to categorizing the product as a flat coating/primer?

6
Director of Sustainability
Leopardo Companies, Inc.
LEEDuser Premium Member
12 thumbs up
Wed Sep 7, 2016, 8:05 pm

ASHREA 0-2005

NC-v4 EAc1:Enhanced commissioning
posted by  Amrit Kaur  on 

Any one knows where I can get the referenced 0-2005 standard? officially its no longer available from ASHREA and superseded by 0-2013. Any idea how different they may be?

2
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Fri Sep 2, 2016, 3:52 pm

Energy Star eligibility for very large Display Monitors

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Harry Flamm  on 

Nowhere on the Energy Star site can I find out if 75" wide and larger Professional Display Monitors (such as Samsung or NEC for conference rooms) are eligible or not for an Energy Star rating. I h

2
Fri Sep 2, 2016, 1:44 pm

Occupants / users of public park

NC-2009 WEp1:Water use reduction
posted by  Deborah Lucking  on 

Our project includes the creation of a park, and construction of a pavilion with restrooms for park users. The challenge - how do we calculate the number of FTEs using these restrooms?

5
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Sep 1, 2016, 8:50 pm

Functional, usable spaces

NC-2009 SSc7.2:Heat island effect - roof
posted by  Jeannie Rueter  on 

What is the definition of "functional, usable spaces"?

3
Wed Aug 31, 2016, 7:34 pm

Planned/future Photovolatic installation

NC-2009 EAc2:On-site renewable energy
posted by  Stacey Olson  on 

I'm working on a project that has installed the infrastructure to support a PV array, and is pursuing Enhanced Commissioning.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Aug 31, 2016, 4:37 pm

High Rise Residential with mixed mode ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Nancy Henderson  on 

We have several high rise residential projects that use a several conditioning and ventilation system.

3
Default Avatar
Managing Member
ArchEcology, LLC
LEEDuser Basic Member
67 thumbs up
Thu Aug 25, 2016, 9:50 pm

Valuation of Recycled Content

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Rebecca Pinto  on 

I would like some clarification on how to calculate recycled content as the v4 Reference Guide is ambiguous, in my opinion. For example, on p.274 of the ID+C ref.

3
Default Avatar
Sustainability Consultant, P.Eng.
Mission Green Buildings
LEEDuser Basic Member
0 thumbs up
Thu Aug 25, 2016, 6:53 pm

LEED Interpretation 5253

NC-2009 EAp2:Minimum energy performance
posted by  Monique Belmer  on 

I'm working on an appeal and the reviewer is asking me why our baseline heating went up significantly between the initial submission and our review response model.

3
Thu Aug 25, 2016, 4:03 pm