Previously developed and graded area by municipality - How long before construction?
NC-2009 SSc1:Site selectionposted by Ilan Yahav on
I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006.
Hoarding dimensions
NC-v4 SSp1:Construction activity pollution preventionposted by Ahmed Labeeb on
Dear All,
Is there any LEED requirement regarding the hoarding dimensions ( distance from ground to the bottom of the panel)?
HVAC Baseline System 8 - with Purchased Chilled Water only
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
We are working on a project where the selected baseline HVAC system type is 8 with purchased chilled water only from a district cooling plant.
Volume to Weight Conversion factors
NC-2009 MRc2:Construction waste managementposted by Yohaan Cama on
Hi All,
LEED v4 EBOM - Commissioning
EBOM-v4 EAc2:Existing building commissioning—implementationposted by Aber Alvi on
A project for which level 2 energy audit had been carried out and implemented more than a year ago, can that energy audit report and the measurement and verification results from the
Option 2. Prescriptive Compliance
CI-v4 EAp2:Minimum energy performanceposted by Sustainability Provider on
We are pursuing for LEED v4 certification for an office space under CI category.
Post occupancy assesment
NC-v4 EQc4:Indoor air quality assessmentposted by eran ben kennaz on
I was asked by the client to collect air samples now- a month after occupancy (he says he forgot to call me before.......). Would that be acceptable when they send in the reports?
CI Office v2009 - Water Cooled Chiller in Base Case & DCP in Proposed Case
CI-2009 EAc1.3:Optimize energy performance - HVACposted by SSN Energy Model on
Hi All,
Greetings!
Any minimum area for Roof after exclusions?
NC-2009 SSc7.2:Heat island effect - roofposted by Orçun Özhelvaci on
Hello,