Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

CS v2009 ventilation need for each space

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  MERVE AYGENC  on 

Does each space need to achieve the airflow suggested by ASHRAE separately or do we considered the overall achievement while using Minimum IEQ Performance Calculator? 

1
Mon Oct 2, 2017, 10:08 pm

Museum Building / Gallery Areas

NC-v4 EQc9:Acoustic performance
posted by  O Moltay  on 

Hi, we have a museum project with general exhibition areas: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide?

1
Thu Feb 15, 2018, 10:42 pm

opaque building envelope construction

NC-v4 EAp2:Minimum energy performance
posted by  Ahmed El-Semary  on 

i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??

6
Mon Sep 18, 2017, 1:25 pm

Survey Participants

EBOM-2009 IEQc2.1:Occupant comfort - occupant survey
posted by  Fareed Alghimlas  on 

We’re working towards the certification of a large office building, where a good portion of the (FTEs) are subcontractors who spend time (minimum 40hrs/week) in the building but don’t necessarily h

1
Wed Oct 5, 2016, 5:17 pm

Number of transients for FTE calculation

Calculating FTEs
posted by  Sunanda Swain, LEED AP BD+C, PQP  on 

Hi, I am working on a LEED for Healthcare project (LEED HC v2009). At the moment I am filling out the scorecards. I am bit confused about calculating number of pick hour transients.

1
Fri Sep 26, 2014, 12:46 pm

Greenfield or previously developed?

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Ilan Yahav  on 

I'm wondering if a project I'm working on, situated near the coast in Israel, is considers a greenfield or developed area.

1
Tue Aug 29, 2017, 2:20 pm

Stormwater Management Plan

NC-2009 SSc6.2:Stormwater design - quality control
posted by  Nisreen Alhussein  on 

I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?

1
Fri Jul 10, 2015, 12:29 pm

Chilled water flow and pipe sizes

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Jayakumar Pamuri  on 

Hi All, I am here to post my query about chilled water system,flow and pipe sizes.

1
Wed Oct 26, 2016, 7:10 am

Proposed case cooling capacity reducing energy savings

NC-2009 EAc1:Optimize energy performance
posted by  SSN Energy Model  on 

Hi, I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP.

1
Thu Jan 19, 2017, 2:11 pm