CS v2009 ventilation need for each space

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  MERVE AYGENC  on 

Does each space need to achieve the airflow suggested by ASHRAE separately or do we considered the overall achievement while using Minimum IEQ Performance Calculator? 

1
Mon Oct 2, 2017, 10:08 pm

Museum Building / Gallery Areas

NC-v4 EQc9:Acoustic performance
posted by  O Moltay  on 

Hi, we have a museum project with general exhibition areas: are there specific values for "Reverberation time requirements", as there are not similar room type in the table 2 of reference guide?

1
Thu Feb 15, 2018, 10:42 pm

opaque building envelope construction

NC-v4 EAp2:Minimum energy performance
posted by  Ahmed El-Semary  on 

i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??

6
Mon Sep 18, 2017, 1:25 pm

CoC number not mentioned on Invoice

NC-2009 MRc7:Certified wood
posted by  Deepika Parmar  on 

Hi, For our project the Invoices donot mention the CoC number.

1
Thu May 21, 2015, 6:39 pm

LEED EBOM Eligibility

EBOM-2009 PIf1:Minimum Program Requirements
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Wed Dec 30, 2015, 5:38 pm

Campus for a gated residential/commercial compound versus ND

LEED Guidance for Campuses and Multiple Buildings
posted by  ABDELHAMID BESHARA  on 

We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.

1
Sat Apr 30, 2016, 4:23 pm

Enhance commissioning

NC-2009 EAc3:Enhanced commissioning
posted by  Mamdooh Amin  on 

Do we have to include the contract document between the owner and the CxA?

1
Tue Aug 9, 2016, 3:07 pm

LEED 2009 IEQc4.2

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Mario S.  on 

We have received a datasheet for a floor coating that do not state the VOC content.

1
Tue Jan 31, 2017, 4:17 pm

Exterior lighting for group certification

NC-2009 SSc8:Light pollution reduction
posted by  Mohamed M. Abd Elhameed  on 

I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance.

1
Mon Jun 12, 2017, 3:13 pm

P: avarage rainfall event

NC-2009 SSc6.1:Stormwater design - quantity control
posted by  ESRA OZKONUKSEVER  on 

Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w

0