credits gained due to implementation hvac load reduction system

NC-2009 IEQc2:Increased ventilation
posted by  sam Alfassy  on 

I am looking to install hvac load reduction system (HLR ), the system functions by recycling the existing indoor AIR and removes CO2 and other indoor air contaminants, resulting in reduction of fre

1
Wed Jan 18, 2017, 5:20 am

Concrete as Temp barriers

NC-2009 MRc2:Construction waste management
posted by  Ahmad Gabir  on 

Hi , We are working on Mega project is Saudi Arabia where we are using the concrete waste to build Safety road/excavation barriers which will be used on site during construction instead of purchasi

1
Tue Nov 29, 2016, 2:05 pm

DEC - EBOM

EBOM-2009 WEc4:Cooling tower water management
posted by  babu rajendran  on 

My project getting chilled water from District energy center which has cooling towers.

1
Wed Dec 10, 2014, 5:35 pm

Reduced Parking Footprint Calculation

NC-v4 LTc7:Reduced parking footprint
posted by  Sefa Sahin  on 

The project building is gallery, museum. Museum category is not included in the Table - Base Ratios for parking spaces, by building type. What is the best option for calculation it?

1
Thu Mar 30, 2017, 3:07 pm

LEED EBOM Eligibility

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Tue Aug 25, 2015, 1:18 pm

Basement That Extends to Plot line

NC-2009 WEc1:Water efficient landscaping
posted by  Omar Elrawy  on 

Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.

1
Fri Mar 11, 2016, 9:49 am

CxA role

NC-2009 EAc3:Enhanced commissioning
posted by  Abdulla Anwar  on 

Can you advise the CxA role if it was a part of Owner organization? .......................... by the way what is the commissioning developed plan CxP?

1
Tue Aug 9, 2016, 3:27 pm

An example of a ducument for Prerequisite 2

ND-Plan-v4 SLLp2:Imperiled species and ecological communities
posted by  oko Yael  on 

Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.

1
Tue Dec 13, 2016, 9:56 pm

Floor Coatings Compliance with IEQc4.3 in LEED 2009

NC-2009 IEQc4.3:Low-emitting materials - flooring systems
posted by  Mario S.  on 

We have a concrete floor, and we plan on putting a coating on top of the concrete finish.

1
Fri Feb 10, 2017, 7:05 pm

Shopping mall and Community Connectivity

General forums
posted by  Nadia Azzam  on 

My project is a mall that is planned to serve a district level; it definately includes at least 10 of the basic services listed in Appendix 1.

1
Thu Dec 4, 2014, 9:36 pm