Residential Core & Shell
posted by soha yamani on
Hello all I am working on a project that consists of 12 residential buildings with 3 prototypes each prototype has 4 identical residential buildings ( 5 stories each) however the owner will comp
WHAT IS DIFFERENCE NFRC 100 AND NFRC 200
NC-2009 EAp2:Minimum energy performanceposted by Ramkrishna Kashyap on
ONLY NON-RESIDENCE ALUMINUM FRAME
Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED
NC-2009 SSp1:Construction activity pollution preventionposted by Aly Adel on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).
Sea Water Cooled Chiller Modeling
NC-v4 EAp2:Minimum energy performanceposted by Sefa Sahin on
Dear All, Our project building is located in Istanbul/Turkey. Cooling will be provided by centralised two chillers. There is not a cooling tower.
CoC number not mentioned on Invoice
NC-2009 MRc7:Certified woodposted by Deepika Parmar on
Hi, For our project the Invoices donot mention the CoC number.
LEED EBOM Eligibility
EBOM-2009 PIf1:Minimum Program Requirementsposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?
Campus for a gated residential/commercial compound versus ND
posted by ABDELHAMID BESHARA on
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.
Enhance commissioning
NC-2009 EAc3:Enhanced commissioningposted by Mamdooh Amin on
Do we have to include the contract document between the owner and the CxA?
LEED 2009 IEQc4.2
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Mario S. on
We have received a datasheet for a floor coating that do not state the VOC content.
Exterior lighting for group certification
NC-2009 SSc8:Light pollution reductionposted by Mohamed M. Abd Elhameed on
I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance.