Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Waste Receipts

NC-2009 MRc2:Construction waste management
posted by  Rashed Al Nasa'a  on 

The contractor on our project has established a weighing station for trucks and vehicles within the project boundary and is planning to use it to measure the amount of diverted waste for MRc2.

1
Mon Jul 17, 2017, 3:34 pm

SRI Value for concerete

NC-2009 SSc7.2:Heat island effect - roof
posted by  soha yamani  on 

Is there a standard SRI Value for concrete that i can use to comply with the credit requirements ? as a part of the roof i am using is concerete and the specs is not addressing this part

1
Thu Nov 26, 2015, 10:32 pm

Infill Site

ND-Plan-v4 SLLp1:Smart location
posted by  Jos Schild  on 

Is there a definition of an 'infill site'?

1
Mon Jul 18, 2016, 3:36 pm

LEED NCv 2009 Multi-Family Residential: Apartment

NC-2009 EAp2:Minimum energy performance
posted by  junaid naseer  on 

Hi All, I have seen this point tackled in many comments earlier but we still have some doubts. We have a residential building of 16 floors which sits on a podium of 3 floors.

1
Tue Nov 22, 2016, 5:36 pm

Deck to Deck Partition

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Omar Elrawy  on 

Dear all, I have a gypsum board partitions with a false ceiling all over the floor.

1
Tue Feb 24, 2015, 9:59 pm

Trucks

NC-v4 LTc7:Reduced parking footprint
posted by  Tarek   on 

In a warehouse Project, for determining the actual parking capacity of the project, are the Trucks counting in the parking spaces ?

1
Wed Mar 29, 2017, 2:53 pm
0

Painting or Coating for Steel Structure

CS-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Ali Soufan  on 

Hi In a steel structure building, in which the steel is within the building weather proof, two applications are applied: 1- Fire Proof Paint (applied on site) 2- Solvent Based Top Coat Paint (appli

1
Sun Jan 31, 2016, 3:51 am

green power source

NC-2009 EAc6:Green power
posted by  sherif el adly  on 

The client have a solar park in a land adjacent to the land on which the project will be built.

1
Thu Dec 1, 2016, 7:10 pm

Baseline Pumping Power

NC-2009 EAp2:Minimum energy performance
posted by  Ahmed Labeeb  on 

Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.

1
Thu Feb 9, 2017, 1:06 pm