NC-2009 MRc2:Construction waste managementposted by Rashed Al Nasa'a on
The contractor on our project has established a weighing station for trucks and vehicles within the project boundary and is planning to use it to measure the amount of diverted waste for MRc2.
SRI Value for concerete
NC-2009 SSc7.2:Heat island effect - roofposted by soha yamani on
Is there a standard SRI Value for concrete that i can use to comply with the credit requirements ? as a part of the roof i am using is concerete and the specs is not addressing this part
Infill Site
ND-Plan-v4 SLLp1:Smart locationposted by Jos Schild on
Is there a definition of an 'infill site'?
LEED NCv 2009 Multi-Family Residential: Apartment
NC-2009 EAp2:Minimum energy performanceposted by junaid naseer on
Hi All, I have seen this point tackled in many comments earlier but we still have some doubts. We have a residential building of 16 floors which sits on a podium of 3 floors.
Deck to Deck Partition
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Omar Elrawy on
Dear all, I have a gypsum board partitions with a false ceiling all over the floor.
Trucks
NC-v4 LTc7:Reduced parking footprintposted by Tarek on
In a warehouse Project, for determining the actual parking capacity of the project, are the Trucks counting in the parking spaces ?
Estimating the energy cost share of PV
NC-2009 EAc2:On-site renewable energyposted by Mohamed M. Abd Elhameed on
I am working on an industrial LEED project in KSA.
Painting or Coating for Steel Structure
CS-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Ali Soufan on
Hi In a steel structure building, in which the steel is within the building weather proof, two applications are applied: 1- Fire Proof Paint (applied on site) 2- Solvent Based Top Coat Paint (appli
green power source
NC-2009 EAc6:Green powerposted by sherif el adly on
The client have a solar park in a land adjacent to the land on which the project will be built.
Baseline Pumping Power
NC-2009 EAp2:Minimum energy performanceposted by Ahmed Labeeb on
Based on ASHRAE 90.1, the chilled water pumping power must be 22 W/gpm and does not mentioned the effect of pumping head.