P: avarage rainfall event
NC-2009 SSc6.1:Stormwater design - quantity controlposted by ESRA OZKONUKSEVER on
Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w
CoC number not mentioned on Invoice
NC-2009 MRc7:Certified woodposted by Deepika Parmar on
Hi, For our project the Invoices donot mention the CoC number.
LEED EBOM Eligibility
EBOM-2009 PIf1:Minimum Program Requirementsposted by Amgad Khattab on
We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?
Campus for a gated residential/commercial compound versus ND
posted by ABDELHAMID BESHARA on
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.
Enhance commissioning
NC-2009 EAc3:Enhanced commissioningposted by Mamdooh Amin on
Do we have to include the contract document between the owner and the CxA?
LEED 2009 IEQc4.2
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Mario S. on
We have received a datasheet for a floor coating that do not state the VOC content.
Exterior lighting for group certification
NC-2009 SSc8:Light pollution reductionposted by Mohamed M. Abd Elhameed on
I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance.
Separating Pantry Zone
NC-2009 EAp2:Minimum energy performanceposted by Omar Elrawy on
Dear all, I have a case where I need to know if I should model separate Pantry zone in Both Basecase and Proposed Case, or in Basecase only? I have an office building with one System 8
Arc Platform
posted by Sarfaraj Khan on
Hi Did any one know any guideline or book from USGBC to complete the project documents for LEED V4 O&M in the Arc Platform if the project is going for performance pathway
Email as Client Letter of Commitment
posted by Nandan Tavkar on
Can client's emails be used in place of letter of commitment form client? Does USGBC accept emails as evidence?