Painting or Coating for Steel Structure
CS-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Ali Soufan on
Hi In a steel structure building, in which the steel is within the building weather proof, two applications are applied: 1- Fire Proof Paint (applied on site) 2- Solvent Based Top Coat Paint (appli
Reuse of aggregates
EBOM-2009 MRc7:Solid waste management - ongoing consumablesposted by Fareed Alghimlas on
The building our team is trying to get it LEED certified has originally a shallow swimming pool with stones and aggregates in it for decorative purposes, during the performance period, the buildin
Satisfaction rating
EBOM-2009 IEQc2.1:Occupant comfort - occupant surveyposted by Fareed Alghimlas on
Is it acceptable to resort to a 5 point scale on the comfort survey instead of the 7 point?
smoke leakage test for duct
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Abdulla Anwar on
Our MEP sub-contractor need to clarify if we can use an smoke capsule for duct leakage test, prior to final air leakage test since the project specs is giving a small allowable 1% from basis of des
Baseline System 2
NC-2009 EAc1:Optimize energy performanceposted by SSN Energy Model on
As per Table 6.8.1D, I observed the following EER = 12.3-(0.213*Cap/1000) EER Also, Cap means the rated cooling capacity of the product in Btu/hr.
How can I develop leed certificate service in my country?
NC-v4 EQp1:Minimum indoor air quality performanceposted by erdem özkan on
We provide Leed certificate and green building service but how are we developing this process in Turkey?
Minimum building energy performance
ND-Plan-v4 GIBp2:Minimum building energy performanceposted by sam Alfassy on
based on the fact that we are on a planning stage only, what would be the documentation that approves compliance to this requirement.
Occupant Default Density vs. Actual density
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Maya Karkour on
Hello, we are working on a C&S Mall project, is it permitted that we uncheck the Default density checkbox in IEQp1 form, and enter expected number of persons based on Architects / Engineers ex
Campus approach in a gated residential compound or ND?
posted by ABDELHAMID BESHARA on
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.
LEED Development Density and community connectivity
NC-2009 SSc2:Development density and community connectivityposted by Sherrin Pulickal on
What does it mean by double the project density compared with average density within a calculated area? Its the ememplary performance in option 1.