School Building

NC-2009 EAp2:Minimum energy performance
posted by  SSN Energy Model  on 

Hi, We are doing the Energy Model for SCHOOL Building. The client has proposed Air cooled chiller.

1
Wed May 25, 2016, 1:43 pm

Inspection Reports - responsible party

NC-2009 SSp1:Construction activity pollution prevention
posted by  komal kotwal  on 

Is it required that the on-site inspection be conducted by a third party or can a Contractor's representative conduct the same?

1
Sun Jan 8, 2017, 5:22 pm

Future-proofing LEED certification - Iran

General forums
posted by  Meike Borchers  on 

I have a slightly different question in regarding to certifiable projects.

1
Thu Aug 10, 2017, 8:04 pm

LEFEV Parking spots in shared garage w/ no dedicated spaces

NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  ELIZABETH REITER  on 

Regarding Option 1 of providing preferred parking for LEFEV for 5% of the total vehicle parking capacity of the site. Here is our issue/question.

1
Mon Aug 10, 2015, 7:27 pm

Heat Recovery Counts?

CS-2009 EAc2:On-site renewable energy
posted by  Dina Ammar  on 

Hello, Will the energy harvested from a heat recovery equipment installed on a chiller and/or the fresh air system in our project count towards on-site renewable energy?

1
Tue Jul 28, 2015, 2:40 pm

Infill Site

ND-Plan-v4 SLLp1:Smart location
posted by  Jos Schild  on 

Is there a definition of an 'infill site'?

1
Mon Jul 18, 2016, 3:36 pm

LEED NCv 2009 Multi-Family Residential: Apartment

NC-2009 EAp2:Minimum energy performance
posted by  junaid naseer  on 

Hi All, I have seen this point tackled in many comments earlier but we still have some doubts. We have a residential building of 16 floors which sits on a podium of 3 floors.

1
Tue Nov 22, 2016, 5:36 pm

Deck to Deck Partition

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Omar Elrawy  on 

Dear all, I have a gypsum board partitions with a false ceiling all over the floor.

1
Tue Feb 24, 2015, 9:59 pm

Trucks

NC-v4 LTc7:Reduced parking footprint
posted by  Tarek   on 

In a warehouse Project, for determining the actual parking capacity of the project, are the Trucks counting in the parking spaces ?

1
Wed Mar 29, 2017, 2:53 pm

Clarification on Solar Hot Water system eligibility

NC-2009 EAc2:On-site renewable energy
posted by  Sasha Peters  on 

Please confirm if solar hot water system is eligible for EA credit 2 - On-Site Renewable Energy compliance considering that it is only used for water heating and not generating energy directly.

1
Mon Apr 20, 2015, 3:17 pm