Leed v4 Core & Shell // Future fit-out by the owner
posted by Louis Haag on
Hi, We have a warehouse project for which the Core&Shell will be built in a first time, and the owner will perform the fit-out himself a few years later. The question is can we go for a LEED
Boundaries of LEED ND publicly available & requirements for NC
ND-v2009 GIBp2:Minimum building energy efficiencyposted by Louis Haag on
Dear LEEDuser team, I have two questions for a new building to be built within the area of an existing LEED ND project (or very near). 1.
Some question about roof garden.
NC-2009 SSc7.2:Heat island effect - roofposted by Shenhao Li on
I have a hotel project in china. Our client will build a roof garden. Some areas of roof garden is vegetated roof, and other area will be construct as lane, tennis court or other things.
Licensed Professional
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Tam Kin Hung on
To comply with the requirement of this prerequisite, data verification checklist and SEP should be submitted.
ESC plan for major renovation of data center
NC-v4 SSp1:Construction activity pollution preventionposted by sean wang on
We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.
Energy Star Related Product
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Wei Zeng on
Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling
200 rides per day required for shuttle buses?
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Weidong Luo on
Private shuttles are employed to satisfy SSc4.1 on our project.
EQ credit 6. Interior Lighting Question.
NC-v4 EQc6:Interior lightingposted by Jae Yong Park on
Hi all, I'm currently working on a research center which is located in South Korea. EQ credit 6. Interior Lighting Option 1.
CCHP Modeling
NC-2009 EAp2:Minimum energy performanceposted by Jie Shen on
Consultant ERM Apr 20 2016 Guest CCHP System modeling Project Location: Japan My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat reco
n/a
NC-v4 SSc2:Site development - protect or restore habitatposted by Biao Ma on
I want to know if vertical green wall with native and local plant species, whether or not can conribute the green ratio for option 1.