Forum quick links
Bird Collision Deterrence
Pilot-Credits SSpc55:Bird collision deterrenceposted by Long Wang on
Hi, I have two questions of this pilot credit for our LEED EB: O+M project V4.
Product Category Testing as per GB China standards.
CI-v4 EQc2:Low-emitting materialsposted by Mahesh Shankar on
We have a CI Office project in Shanghai, where we are attempting for Low Emitting materials credit. The testing for three categories of materials that we have, are as per GB China standards.
Envelope Cx Testing
NC-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
I'm working on a project with envelope commissioning. It is a large data center type building.
Equipment Power Density for Plant Room
CS-v4.1 EAc2:Optimize Energy Performanceposted by Chi Hung Yip on
I need to input a figure for the equipment power density for plant room, but I do not have such figure in my design brief. Can anyone tell me the reference value with the supporting source?
how do you manage providers that provide the right materials for LEED?
Pilot-Credits SSpc55:Bird collision deterrenceposted by kim sung on
Hello.
There is a question as a preliminary contractor for bird collision deterrence.
Withdrawal of Appeal?
posted by shashank gangil on
Hi
Energy Modelling - Baseline water-cooled chiller's COP, adjusted to local outdoor conditions in lieu of AHRI conditions?
CI-v4 EAc2:Optimize energy performanceposted by Andrew Xiao Junzhao on
Dear LEED APs,
I have a LEED CI v4 project in Taipei, Taiwan, which require whole building energy modelling. Couple of questions I hope to seek clarity:
Proof on Exceptional Calculations of Energy Modelling
CS-2009 EAp2:Minimum energy performanceposted by Kathy Wong on
Our LEED project has adopted lighting control as energy-saving strategy for parking garage and documented as exceptional calculation in EAp2 and EAc1.
Project in 2 separate floor of a same building, can they go for one certification?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by shashank gangil on
We are new to LEED Certification. We are currently bidding for a new LEED v4 ID+C: Commercial Interior Project.