Forum quick links
Doctor Room
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Dinesh V on
What is the Category of Doctor Room as per ASHRAE 62.1.2007 Space classifications ?
LEED Certification
posted by Keerthi Ratnayake on
Hi!
ID for Smart Home System
NC-2009 IDc1:Innovation in designposted by Tim Middleton on
Our project is mixed use, roughly 1/3 retail, 1/3 residential and 1/3 hotel. We want to apply for Innovation for the use of Smart Home systems in the residential part.
Software's for International Use
NC-v4 MRc1:Building life-cycle impact reductionposted by Aqrab Ali Rana on
Kindly advise on software which can be used in Pakistan, their cost and complexity of use.
Energy Modeling Necessity
NC-v4 EAp2:Minimum energy performanceposted by Nandana Kumar on
We have a project space where the built up area is 2 lakh sqft out of which the conditioned space is 1000 sqft. Is energy modeling necessary in this scenario?
Ongoing purchasing and waste policy
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by VISHESH AGARWAL on
Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.
Lighting control for Meeting room
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Thanh Le on
If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.
Compliance path for demonstrating minimum daily transit trip
CI-v4 LTc3:Access to quality transitposted by Dipti Talwar on
I am working on a project located in India.
Onsite solar PV generation - 10 years contract
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Ameet AA on
Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?