Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.
Elevated buggy paths qand bridges for resort projecct
NC-2009 SSc7.1:Heat island effect - nonroofposted by John Covello on
Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.
Natural ventilation for residential
CS-2009 IEQp1:Minimum indoor air quality performanceposted by mai elly on
HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.
Required parking lots and LEED boundary Calculations
CS-2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking
Actual Operation of Carpool parking
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Jatuwat Varodompun on
We have a restaurant apply for LEED NC retail, We have the carpool parkings for both customers abd staffs.
Green Product- FSC
EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
If toilet roll and Hand roll is FSC Certified then it can take count as sustainable product category in the Janitorial paper Product Category.
Mandatory requirements
NC-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.
Location of OA monitor at PAU or AHUs
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Indochine Engineering VN on
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic
Core and Shell - Retail
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We are working on a retail mall where each tenant retail space is provided with a chilled water tap off.
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.