Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Basic Doubts

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.

1
Tue Apr 19, 2016, 2:57 pm

Elevated buggy paths qand bridges for resort projecct

NC-2009 SSc7.1:Heat island effect - nonroof
posted by  John Covello  on 

Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.

1
Mon Jul 17, 2017, 9:10 am

Natural ventilation for residential

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  mai elly  on 

HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.

1
Thu Dec 10, 2015, 3:01 pm

Required parking lots and LEED boundary Calculations

CS-2009 MPR3:Must use a reasonable site boundary
posted by  kerry wang  on 

Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking

0

Actual Operation of Carpool parking

NC-2009 SSc4.4:Alternative transportation - parking capacity
posted by  Jatuwat Varodompun  on 

We have a restaurant apply for LEED NC retail, We have the carpool parkings for both customers abd staffs.

1
Fri Nov 27, 2015, 4:48 am

Green Product- FSC

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  VISHESH AGARWAL  on 

If toilet roll and Hand roll is FSC Certified then it can take count as sustainable product category in the Janitorial paper Product Category.

1
Thu Aug 25, 2016, 2:39 pm

Mandatory requirements

NC-2009 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.

1
Fri Sep 25, 2015, 2:56 pm

Location of OA monitor at PAU or AHUs

NC-2009 IEQc1:Outdoor air delivery monitoring
posted by  Indochine Engineering VN  on 

Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic

1
Tue Oct 13, 2015, 5:55 pm

Core and Shell - Retail

CS-2009 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

We are working on a retail mall where each tenant retail space is provided with a chilled water tap off.

1
Thu Feb 2, 2017, 3:32 pm

Single certification for physically distinct structures

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  NAMRATA GUPTA  on 

We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.

1
Fri Jul 7, 2017, 8:17 pm