Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Option-3: Irrigation Meter Installed

EBOM-v4 WEc1:Outdoor water use reduction
posted by  VISHESH AGARWAL  on 

i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.

1
Wed Mar 8, 2017, 11:34 pm

Project located in a building with a very low fresh air rate

Retail-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Valentin Grimaud  on 

What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t

1
Tue Jan 17, 2017, 9:15 pm

WE Credit 4.2: Cooling Tower Water Management- non potable

EBOM-2009 WEc4:Cooling tower water management
posted by  satheesh M  on 

The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.

1
Tue Dec 1, 2015, 4:07 pm

Amenities Within Main Building

Credit Forums
posted by  Aswin M  on 

We have a Retail Commercial Interior project inside a Main building.

1
Mon Jan 16, 2017, 12:23 am

Painting/coating in tenant space

CS-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Indochine Engineering VN  on 

Hi, My project is a mixed use building with 2 floor on the top for apartments. building developer design interior fit out in all apartment for lease.

1
Thu Jan 19, 2017, 10:50 am

Duct sealing methods

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  John Covello  on 

Hello, Can alternative methods for duct sealing be used besides plastic wrap? One of our contractors is proposing using foam to seal the end of the duct openings.

1
Fri Dec 5, 2014, 12:23 am

CREC purchase

CI-2009 EAc4:Green power
posted by  Harpreet Rooprai  on 

I am doing a CI project, in which we are attempting credit EAc4 buying doing an Indian purchase of CREC's.

1
Mon Apr 25, 2016, 2:44 pm

Furniture heights

CI-v4 EQc8:Quality views
posted by  Subramaniam Chandrasekaran  on 

exactly same as the below mentioned point; for a project, the interior designer wants to know whether they have to go with 1050 mm or 1100 mm of workstation height; this clarification answers; but

1
Mon Jul 10, 2017, 12:43 pm

compliance for naturally ventilated spaces

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Poorva Keskar  on 

Referring to the FAQs fan-assisted ventilation in naturally ventilated spaces can be considered as mechanical ventilation.

1
Thu Aug 31, 2017, 5:37 pm

Cleaning Chemicals

Hospitality-EBOM-v4 EQc7:Green cleaning - products and materials
posted by  VISHESH AGARWAL  on 

Is laundary and kitchen cleaning chemicals included in LEED V4.

1
Tue Jan 17, 2017, 8:52 pm