Forum quick links
Nee of a fire suppression system
NC-2009 EAc4:Enhanced refrigerant managementposted by Magda Aghababyan on
Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo
Acoustic performance
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by neeraj arora on
How to calculate composite STC for a room?
Can I select my building as "Healthcare" in Portfolio Manager?
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Amornchai Challcharoenwattana on
My building is a licensed hospital and we are trying to be certified in the category of LEED Existing Building O&M as Healthcare option is not available in LEED V.3.
Glare control device simulation - Option 2
NC-v4 EQc7:Daylightposted by Hanh Truong on
Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).
Weekly Log
EBOM-v4 WEc4:Water meteringposted by Kristina Pobre on
Is there a minimum number of logs required to be submitted to comply with this credit? The project I am handling wishes to install the meter but because of the log requirement, we might need to de
ASHRAE 55 - apartment
NC-2009 IEQc7.1:Thermal comfort - designposted by Indochine Engineering VN on
My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally.
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Probability distribution of annual PV production.
NC-2009 EAc2:On-site renewable energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.
100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum energy performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Exterior windows and doors?
NC-2009 MRc1.2:Building reuse - maintain interior nonstructural elementsposted by Erin Holdenried on
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?