Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

ESVE Requirement

Pilot-Credits LTpc70:Green vehicles
posted by  Joshua Chia  on 

Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or time-of-use pricing means that we must participate in either on

0

Building Flush out for naturally ventilated building

EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterations
posted by  PRATIK KUMAR  on 

Under EBOM IEQ-Cr-1.5, i have a building which is naturally ventilated, i am doing painting for the building, how do i meet the flush out procedure.

1
Wed Mar 16, 2016, 2:11 am

1.5 FAR for a residential project

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Katherine Ann Resurreccion  on 

Hi, The credit states that projects with 1.5 FAR will allow vegetated roof or roof gardens to be qualified in the area calculations.

1
Wed May 31, 2017, 2:49 pm

Choosing between LEED CS and EB for commercial building in India

LEED Rating System Selection
posted by  Pushkala R  on 

HI, I am trying to apply for LEED certification as per LEED v3 2009 in India. My project profile is as follows: 1. It an existing building that has been in use for over a decade. 2.

1
Fri Nov 27, 2015, 8:39 pm

ETS Standard Signage

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Lowella Villanueva  on 

Hello Everyone, We are currently working on a project that requires LEED certification. In this regards, I am soliciting everyone's support to share me your expertise on LEED.

1
Sat Aug 26, 2017, 8:34 pm

Is APPENDIX Needed

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  ABDUL MUTHALIB MOHAMED  on 

In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we need to fi

0

LEED V3 Vs V4

EBOM-2009 EAc3.2:Performance measurement - system-level metering
posted by  VISHESH AGARWAL  on 

Advanced energy metering: if a project have all end use submeter but no have enery reporting software or BAS.

1
Fri Jun 3, 2016, 8:50 pm

Changed awarded credit to attempted

LEED Rating System Selection
posted by  Prudhvi Mahadev  on 

I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?

1
Sat Aug 26, 2017, 7:42 pm

CORE area and SHELL area

CS-2009 IEQc4.1:Low-emitting materials - adhesives and sealants
posted by  Yodi Danusastro  on 

How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.

1
Mon Mar 30, 2015, 1:17 am

Energy Modeling

NC-2009 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi everyone, I am doing energy modeling for my project in Pakistan and i want to need some clarification and help from seniors: 1) Is it true that for baseline and proposed case HVAC system shoul

1
Wed Jun 29, 2016, 2:05 pm