CI-v4 MPR2:Must use reasonable LEED boundariesposted by Ameet AA on
Hi, The project is a 3-storey high building, single tenant. The tenant already occupies the building, and going to renovate about half of the floor area.
Green Cleaning
NC-2009 IDc1:Innovation in designposted by Stella Stella on
Hi, We are trying to document Green cleaning towards 1 point under Innovation for our LEED NC project.Is it sufficient to just follow the EBOM requirement for IEQ P3 & 3.1 to document complianc
Ice machines
NC-v4 WEc4:Water meteringposted by John Covello on
Hello. Are Ice Machines considered process water for the purposes of this credit? If they are connected to a freezer does that count?
No Cooling Tower - Alternative Compliance Path
NC-v4 WEc3:Cooling tower water useposted by Kristina Pobre on
My project does not have a cooling tower.
LEED-GA as a student
posted by PRATIK KUMAR on
Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i
Purchasing RECs for Projects with District Cooling
CS-2009 EAc6:Green powerposted by Katherine Ann Resurreccion on
Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling.
Tile finishes for flat roof
CS-2009 SSc7.2:Heat island effect - roofposted by Magda Aghababyan on
We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?
Blind
CI-v4 EQc5:Thermal comfortposted by Ameet AA on
Hi, Can blind be considered as control for thermal comfort? Thanks.
District Co generation Plantby
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Storm water calculation
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Magda Aghababyan on
Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development