Forum quick links
Location of OA monitor at PAU or AHUs
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Indochine Engineering VN on
Hi, my project has PAU distributes 100% OA to AHUs so I want to ask if installing 1 OA meter at PAU is sufficient for the credit or I have to install meters at every AHU? Thank you for your advic
Core and Shell - Retail
CS-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We are working on a retail mall where each tenant retail space is provided with a chilled water tap off.
Single certification for physically distinct structures
NC-v4 MPR2:Must use reasonable LEED boundariesposted by NAMRATA GUPTA on
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc.
Job Specific Environment Analysis
NC-2009 SSp1:Construction activity pollution preventionposted by Yodi Danusastro on
Does anyone has the template of JSEA? I've been ask to create ESC with inclusion of JSEA template. Where an I find this template?
LEED CI 2009 _ MR Cr1.1_Tenant Space- Long Term Commitment
CI-2009 MRc1.1:Tenant space - long-term commitmentposted by Kusha Dogra Sehgal on
I am currently working on LEED CI 2009 project.
Acoustic performance
Data-Centers-NC-v4 EQc9:Acoustic performanceposted by neeraj arora on
How to calculate composite STC for a room?
Can I select my building as "Healthcare" in Portfolio Manager?
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by Amornchai Challcharoenwattana on
My building is a licensed hospital and we are trying to be certified in the category of LEED Existing Building O&M as Healthcare option is not available in LEED V.3.
Glare control device simulation - Option 2
NC-v4 EQc7:Daylightposted by Hanh Truong on
Dear all, I am targeting the Daylight credit by modelling based on Option 2. However, the simulation results show that the illuminance level over the threshold (3,000 lux).
Weekly Log
EBOM-v4 WEc4:Water meteringposted by Kristina Pobre on
Is there a minimum number of logs required to be submitted to comply with this credit? The project I am handling wishes to install the meter but because of the log requirement, we might need to de
ASHRAE 55 - apartment
NC-2009 IEQc7.1:Thermal comfort - designposted by Indochine Engineering VN on
My project has apartments and penthouses on the top. Engineers design VRF with thermostat and residents can control their comfort thermally.