Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Accidentally Opened Awarded Credit during Appeal Stage

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Bernard Sagaiyaraj  on 

My team member accidentally opened 2 awarded credits during the Appeal Stage for some other non-compliance credits. No changes were made to the form.

1
Tue Aug 25, 2015, 1:06 pm

Option-3: Irrigation Meter Installed

EBOM-v4 WEc1:Outdoor water use reduction
posted by  VISHESH AGARWAL  on 

i am working on the project where project team use the STP Non potable water used for irrigation purpose. so i am reducing the 100% potable water. can i sufficient to achieve this credit.

1
Wed Mar 8, 2017, 11:34 pm

Project located in a building with a very low fresh air rate

Retail-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Valentin Grimaud  on 

What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t

1
Tue Jan 17, 2017, 9:15 pm

WE Credit 4.2: Cooling Tower Water Management- non potable

EBOM-2009 WEc4:Cooling tower water management
posted by  satheesh M  on 

The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.

1
Tue Dec 1, 2015, 4:07 pm

Amenities Within Main Building

Credit Forums
posted by  Aswin M  on 

We have a Retail Commercial Interior project inside a Main building.

1
Mon Jan 16, 2017, 12:23 am

Modeling OA with Demand control ventilation

CS-2009 EAp2:Minimum energy performance
posted by  Indochine Engineering VN  on 

Hi, I have demand control ventilation for every AHU.

1
Thu Sep 25, 2014, 1:18 pm

Is it too late to do SSp1?

NC-2009 SSp1:Construction activity pollution prevention
posted by  Indochine Engineering VN  on 

Hi, My project is a hotel and client just decided to do LEED when Construction of structure is almost done.

0

Proposed Case-Process Load

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi, Is there any limitations in LEED V4 regarding process energy that it should be minimum 25% (In proposed case) of the baseline energy cost for the building.

1
Wed May 24, 2017, 4:24 pm

Dormitory as support building

NC-2009 PIf2:Project Summary Details
posted by  ABDUL MUTHALIB MOHAMED  on 

We would like to register a factory building in Bangladesh. Th built up area of factory building is 2 lakh SFT, Ground level only.

1
Fri Apr 29, 2016, 12:24 pm