Forum quick links
Venlilation Spaces Only
NC-2009 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All:- Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model As per LEED Missing manual we follow below things "Assign HVAC systems as per Ap
LEED-GA as a student
posted by PRATIK KUMAR on
Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i
Purchasing RECs for Projects with District Cooling
CS-2009 EAc6:Green powerposted by Katherine Ann Resurreccion on
Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling.
Tile finishes for flat roof
CS-2009 SSc7.2:Heat island effect - roofposted by Magda Aghababyan on
We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?
Process Load
NC-2009 EAc1:Optimize energy performanceposted by Muzammal Abbas on
Dear all, We are doing a factory project in pakistan, which have a 1200 kw process machinery load, after energy modeling without process load we are saving 55 % from baseline but after adding proce
Sample Documentation
NC-2009 SSc7.1:Heat island effect - nonroofposted by Ernesto Agco on
Could anyone care to show me a sample SSc7.1 documentation that was already approved by USGBC? Or even just a documentation format coming from an approved submission. :)
Certify some of multiple fitout floor
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by sompoche sirichote on
Our client will rent 8,10-20 floor within 20 stories building. They would like to get LEED CI certify only for 8 and 10 floor. Can it be done under single project certification?
Glass Doors
NC-2009 IEQc8.1:Daylight and views - daylightposted by John Covello on
Hello, Do Glass Doors count as windows and require automatic glare control?
Alternative Outdoor Air Supply for Basement Parking
CS-2009 IEQp1:Minimum indoor air quality performanceposted by Katherine Ann Resurreccion on
Hi All, We would like to get your opinion in the situation below if approach is acceptable to IEQp1: We have an enclosed Driver’s lounge, Lift lobbies and Administration office at the Basement fl
Recycled content in Steel frame of facade
NC-2009 MRc4:Recycled contentposted by Indochine Engineering VN on
Hi, I would like to ask in case that facade manufacturer cannot confirm recycled content in their steel frame of facade, can I use default number 25% recycled content for steel product as stated in