Required parking lots and LEED boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking s
Project Registration
NC-v4 EAp2:Minimum energy performanceposted by Muzammal Abbas LEED AP (BD+C) on
Hi, We have project in Pakistan and we had done all measures for LEED certification, but due to some client personal reasons we were not able to register this project with USGBC and now after 1.5
Building Orientation
NC-v4 EAp2:Minimum energy performanceposted by Muzamil Rafique on
Hello Marcus, 1.My project orientation on NW,NE,SW and SE.
LEED CS 2009 - WEp1 & WEc3
CS-2009 WEp1:Water use reductionposted by Ruel Galve on
We are building a mixed use project, Office, Hotel and Residential to qualify for LEED CS 2009 Gold. Only the office core will have toilets that will be built during C & S construction.
Open Plan office served by 4 AHUs
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Michael Wahjudi on
Hi all, we received comments from reviewer that requesting the system computation should be separated for each system. Our development consists of few meeting rooms and open plan offices.
EBOM V4- IPM
Hospitality-EBOM-v4 EQc9:Integrated pest managementposted by VISHESH AGARWAL on
For Pursing the option-1. In house IPM Policy: is it mandatory to use the SF Tier-III Pesticide or use government approved pesticide.
Documents Required For pre-certification for LEED V4 Core Shell
CS-v4 MPR1:Must be in a permanent location on existing landposted by Aqrab Ali Rana on
I have project of apartment in Pakistan, What are documents required for all credits actually??Do I have to submit all documents as I submit for preliminary review or just to tell the strategies an
ESVE Requirement
Pilot-Credits LTpc70:Green vehiclesposted by Joshua Chia on
Hi, hope someone can help clarify whether the requirement for the ESVE to be capable of participating in a demand-response program or time-of-use pricing means that we must participate in either on
Building Flush out for naturally ventilated building
EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by PRATIK KUMAR on
Under EBOM IEQ-Cr-1.5, i have a building which is naturally ventilated, i am doing painting for the building, how do i meet the flush out procedure.
1.5 FAR for a residential project
NC-v4 SSc2:Site development - protect or restore habitatposted by Katherine Ann Resurreccion on
Hi, The credit states that projects with 1.5 FAR will allow vegetated roof or roof gardens to be qualified in the area calculations.