Forum quick links
LEED certification fees
posted by Nazli Hussain on
Can you please tell me about all compulsory certification fees to get LEED certification? Registration fees, split / combined design review fees , appeal fees - all are compulsory . Am i right ?
Reclaim land for more than 40 years
NC-v4 MPR1:Must be in a permanent location on existing landposted by Michael Wahjudi on
"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.
All controls provided using customised mobile app
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Yusuf Turab on
We are working on an IT office building that does not have any switches to control lighting.
Purchasing- Ongoing
EBOM-v4 MRc1:Purchasing - ongoingposted by VISHESH AGARWAL on
what percentage of documentation should be required in local food material (100 miles).
Regularly Occupied Spaces
CS-2009 IEQc8.1:Daylight and views - daylightposted by Muzammal Abbas LEED AP (BD+C) on
I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular
LEED Platinum
EBOM-2009 EAp1:Energy efficiency best management practices - planning, documentation and opportunity assessmentposted by Muzammal Abbas LEED AP (BD+C) on
We had submitted one of our LEED EBOM V4 project final review and received 72 points. We had accepted the review and received Certified Gold Level.
Modeling pump, fan, COP
CS-2009 EAp2:Minimum energy performanceposted by Indochine Engineering VN on
Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers.
Heat gain originating from hooded equipment in energy modeling
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
I am doing energy simulations for a factory.
Bamboo Flooring to be considered in certified wood calculations
NC-2009 MRc7:Certified woodposted by ABDUL MUTHALIB MOHAMED on
We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.
leed ebom- v4: Enhanced indoor air quality strategies
EBOM-2009 IEQc1.2:Indoor air quality best management practices - outdoor air delivery monitoringposted by VISHESH AGARWAL on
Option 2. Additional enhanced IAQ strategies (1 point) Comply with the requirements of at least one of the following. 1. Filtration for mechanically ventilated spaces 2. Carbon Dioxide Monitors 3.