Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Thermal Comfort - ACP for Projects in India

NC-2009 IEQc7.1:Thermal comfort - design
posted by  Gopinath Vasu  on 

Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con

1
Thu Dec 22, 2016, 9:26 pm

Mandatory requirements

NC-2009 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.

1
Fri Sep 25, 2015, 2:56 pm

Ongoing purchasing and waste policy

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  VISHESH AGARWAL  on 

Thanks in advance can any share the link of LEED V4 Ongoing purchasing and waste policy Tempelate.

1
Fri Oct 21, 2016, 10:29 pm

Lighting control for Meeting room

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Thanh Le  on 

If a meeting room is designed with occupany sensor and manual override, does it comply with this credit. If it does not comply, how do we do to comply with this credit.

1
Tue Jan 10, 2017, 8:15 pm
1
Sat Aug 26, 2017, 6:50 pm

Onsite solar PV generation - 10 years contract

EBOM-v4 EAc7:Renewable energy and carbon offsets
posted by  Ameet AA  on 

Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?

1
Tue Jun 27, 2017, 1:17 am

Basic Doubts

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Rathnashree Bharadwaj  on 

I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.

1
Tue Apr 19, 2016, 2:57 pm

Elevated buggy paths qand bridges for resort projecct

NC-2009 SSc7.1:Heat island effect - nonroof
posted by  John Covello  on 

Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.

1
Mon Jul 17, 2017, 9:10 am

Natural ventilation for residential

CS-2009 IEQp1:Minimum indoor air quality performance
posted by  mai elly  on 

HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.

1
Thu Dec 10, 2015, 3:01 pm

Required parking lots and LEED boundary Calculations

CS-2009 MPR3:Must use a reasonable site boundary
posted by  kerry wang  on 

Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking

0