Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

BAS

EBOM-2009 EAc3.1:Performance measurement - building automation system
posted by  VISHESH AGARWAL  on 

Is it necessary to have exterior lighting monitor and control to achieve this credit point. if interior is on BMS, Will i able to take that credit.

1
Tue May 17, 2016, 12:27 pm

V3 project Minimum Indoor Air Quality Performance Pre-requisite.

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  sajjad Malik  on 

I have submitted minimum indoor air quality performance pre-requisite for final design review and reviewer ask me for a narrative but I do not find any option for upload the narrative or any option

1
Thu Jul 20, 2017, 5:28 pm

HVAC modelling for Tenant Occupied Spaces

CS-2009 EAp2:Minimum energy performance
posted by  Saumendra Aggrawal  on 

I am working on a project, which is going for LEED C&S. The project has tenant occupied space, which has designed HVAC system for it.

1
Sun Jun 19, 2016, 8:52 pm

Open space definition

NC-2009 SSc5.2:Site development - maximize open space
posted by  sompoche sirichote  on 

My project is in the industrial area which allows building footprint not exceeding 66% of total site area.

1
Wed Apr 22, 2015, 7:02 pm

Can I omit the IP credit since it is stand alone?

NC-v4 IPc1:Integrative process
posted by  wachira sosaeng  on 

Generally,in other categories, we have to perform to meet all prerequisites though we don't need any credits in the categories (suppose that we have enough credits that meet our goal.

1
Mon Aug 1, 2016, 3:21 pm

Heat Island Reduction

EBOM-v4 SSc3:Heat island reduction
posted by  VISHESH AGARWAL  on 

Dear All, Can I take option-2: Roof (1 Points) and option-4: Parking Under Cover (1 Points) Simultaneously for achieving 2 points under this category OR we need to use option-3 for targeting the 2

0

treat wastewater to teriary standards?

NC-2009 WEc3:Water use reduction
posted by  Erin Holdenried  on 

I have a project that is pursuing WEc2 via Option 2 treating wastewater to tertiary standards and infiltrating onsite through landscape irrigation. Can this factor into water saving for WEc3??

1
Fri Nov 27, 2015, 7:33 pm

LEED Boundary

NC-2009 IEQp1:Minimum indoor air quality performance
posted by  ABDUL MUTHALIB MOHAMED  on 

I am working on LEED boundary for Factory building. The factory has two buildings with common car parking but we are applying LEED certification for only building - 1.

1
Fri Nov 6, 2015, 1:22 pm

Area clarification

CS-2009 EAp2:Minimum energy performance
posted by  Magda Aghababyan  on 

Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y

1
Thu Nov 24, 2016, 8:11 am

LOCAL EQUAVALENT - WHERE EIA IS NOT COMMONLY DONE (INDIA)

Healthcare-v2009 SSp2:Environmental site assessment
posted by  jesmin joseph  on 

Dear Sir, We have registered a 200 bed Multispecialty hospital in India under LEED V2009 BD+C Healthcare rating system.

1
Thu Mar 9, 2017, 11:17 am