Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Ventilation design-worst case conditions

CI-2009 IEQp1:Minimum indoor air quality performance
posted by  S Nagarajan  on 

How to provide a narrative to explain how the worst-case condition was determined considering the total design airflow rate at the condition analyzed

1
Fri Nov 19, 2021, 6:15 pm

LEED certification fees

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Nazli Hussain  on 

Can you please tell me about all compulsory certification fees to get LEED certification? Registration fees, split / combined design review fees , appeal fees - all are compulsory . Am i right ?

1
Mon Aug 7, 2017, 4:02 pm

Reclaim land for more than 40 years

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Michael Wahjudi  on 

"All LEED projects must be constructed and operated on a permanent location on existing land" from these statement.

1
Wed Mar 16, 2016, 3:59 pm

All controls provided using customised mobile app

NC-2009 IEQc6.1:Controllability of systems - lighting
posted by  Yusuf Turab  on 

We are working on an IT office building that does not have any switches to control lighting.

1
Wed Jan 18, 2017, 1:02 am

Purchasing- Ongoing

EBOM-v4 MRc1:Purchasing - ongoing
posted by  VISHESH AGARWAL  on 

what percentage of documentation should be required in local food material (100 miles).

1
Wed Aug 31, 2016, 10:04 pm

Regularly Occupied Spaces

CS-2009 IEQc8.1:Daylight and views - daylight
posted by  Muzammal Abbas LEED AP (BD+C)  on 

I am working on a core and shell project and i want to clarify my below mentioned points for V3 & V4 from seniors.Thanks 1) In core and shell project for daylight do we need to add all regular

1
Fri Oct 28, 2016, 2:59 pm

Table PIf3-1 Space Usage Type - Owned vs Leased

NC-2009 PIf3:Occupant and Usage Data
posted by  Terrapin BrightGreen  on 

Hi could you confirm whether the "Owned/Leased" column is meant to reflect the project owner's usage management versus the building owner's usage?

1
Mon Jan 16, 2017, 2:11 pm

Modeling pump, fan, COP

CS-2009 EAp2:Minimum energy performance
posted by  Indochine Engineering VN  on 

Hi, I have many chilled water pumps, 1 primary and 3 loop secondary pumps with heat exchangers.

1
Tue Oct 7, 2014, 1:20 pm
1
Wed Dec 17, 2014, 3:15 pm

Bamboo Flooring to be considered in certified wood calculations

NC-2009 MRc7:Certified wood
posted by  ABDUL MUTHALIB MOHAMED  on 

We have suggested bamboo flooring in a project for 2000 SFT. Should we include bamboo flooring in Certified wood calculations? Please clarify. Thanks in Advance.

1
Tue Jan 17, 2017, 11:52 pm