Probability distribution of annual PV production.
NC-2009 EAc2:On-site renewable energyposted by Indochine Engineering VN on
Hi, a solar PV consultant gave me an output of their simulation, in which show probability distribution diagram of Solar PV production.
100% outdoor air indirect evaporative cooling system
NC-2009 EAp2:Minimum energy performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Exterior windows and doors?
NC-2009 MRc1.2:Building reuse - maintain interior nonstructural elementsposted by Erin Holdenried on
I assume exterior window and doors are included in this credit, as they are excluded from MRc1.1?
Building Flush out for naturally ventilated building
EBOM-2009 IEQc1.5:Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by PRATIK KUMAR on
Under EBOM IEQ-Cr-1.5, i have a building which is naturally ventilated, i am doing painting for the building, how do i meet the flush out procedure.
1.5 FAR for a residential project
NC-v4 SSc2:Site development - protect or restore habitatposted by Katherine Ann Resurreccion on
Hi, The credit states that projects with 1.5 FAR will allow vegetated roof or roof gardens to be qualified in the area calculations.
Choosing between LEED CS and EB for commercial building in India
posted by Pushkala R on
HI, I am trying to apply for LEED certification as per LEED v3 2009 in India. My project profile is as follows: 1. It an existing building that has been in use for over a decade. 2.
ETS Standard Signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Lowella Villanueva on
Hello Everyone, We are currently working on a project that requires LEED certification. In this regards, I am soliciting everyone's support to share me your expertise on LEED.
Is APPENDIX Needed
NC-2009 IEQp1:Minimum indoor air quality performanceposted by ABDUL MUTHALIB MOHAMED on
In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we need to fi
LEED V3 Vs V4
EBOM-2009 EAc3.2:Performance measurement - system-level meteringposted by VISHESH AGARWAL on
Advanced energy metering: if a project have all end use submeter but no have enery reporting software or BAS.
Changed awarded credit to attempted
posted by Prudhvi Mahadev on
I have mistakenly checked the credit box to "Attempted" for the credit which was alreadly awarded in LEED onlie portal. how to claim that the credit is already awarded in the final submission?