Forum quick links
Thermal Comfort - ACP for Projects in India
NC-2009 IEQc7.1:Thermal comfort - designposted by Gopinath Vasu on
Dear All, Kindly clarify the following query regarding Thermal Comfort Design Alternative Compliance Path for projects in India. In ACP it is said that projects shall meet the desired comfort con
Motorbike, motocycle & Scooter parking count towards SS CR 4.4?
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by John Covello on
Hello everyone, I see in earlier posts that it is unclear if motorbike, scooters & motorcycles parking counts towards this credit's total or not.
Calculating Average Density: Residential Areas or Neighborhood
CI-2009 SSc2:Development density and community connectivityposted by Ajay Kumar on
For Option 2: Community Connectivity. # Is located within 1/2-mile of a residential area or neighborhood with an average density of 10 units per acre net. Please clarify on how to calculate the a
Green pavers
CS-2009 SSc5.2:Site development - maximize open spaceposted by jesmin joseph on
Can green/grass pavers comply towards maximum open space credit? Can we consider 25% percentage of grass paver area as vegetated area and other 75% as pedestrian oriented hardscape area? Please a
EA Cr 1.5
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by balasubramaniam kg on
We have a retail commercial project in a leed certified building that is an air port. we want to know for the UA calculation only requires to use the project areas or all the building areas.
Onsite solar PV generation - 10 years contract
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Ameet AA on
Hi, Is it compulsory to sign a 10 years contract with the solar PV supplier (the PV panels are installed on the rooftop of the project building)?
Basic Doubts
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
I have a few basic Doubts regarding what is stated in the reference guide. Please clarify. 1.
Elevated buggy paths qand bridges for resort projecct
NC-2009 SSc7.1:Heat island effect - nonroofposted by John Covello on
Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings.
Natural ventilation for residential
CS-2009 IEQp1:Minimum indoor air quality performanceposted by mai elly on
HI, The client requesting to have DX air conditioning system for each space in the building. My questions: 1. Could I use the sliding door as operable wall/window to supply the fresh air? 2.
Required parking lots and LEED boundary Calculations
CS-2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking