Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Alternative HVAC duct sealant

NC-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  John Covello  on 

Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.

1
Wed Nov 19, 2014, 6:19 pm

Venlilation Spaces Only

NC-2009 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Dear All:- Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model As per LEED Missing manual we follow below things "Assign HVAC systems as per Ap

1
Sun Apr 17, 2016, 9:59 pm

LEED-GA as a student

General forums
posted by  PRATIK KUMAR  on 

Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i

1
Tue May 24, 2016, 1:13 pm

Purchasing RECs for Projects with District Cooling

CS-2009 EAc6:Green power
posted by  Katherine Ann Resurreccion  on 

Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling.

1
Fri Jul 28, 2017, 4:03 pm

Tile finishes for flat roof

CS-2009 SSc7.2:Heat island effect - roof
posted by  Magda Aghababyan  on 

We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?

1
Mon Aug 22, 2016, 5:48 am

Blind

CI-v4 EQc5:Thermal comfort
posted by  Ameet AA  on 

Hi, Can blind be considered as control for thermal comfort? Thanks.

1
Tue Jan 17, 2017, 7:41 pm

District Co generation Plantby

EBOM-2009 EAp2:Minimum energy efficiency performance
posted by  satheesh M  on 

Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.

1
Tue Nov 10, 2015, 11:50 pm

Storm water calculation

CS-2009 SSc6.1:Stormwater design - quantity control
posted by  Magda Aghababyan  on 

Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development

1
Thu Jan 19, 2017, 5:50 pm

100% outdoor air indirec evaporative cooling system

NC-2009 EAp2:Minimum energy performance
posted by  BEE Incorporations  on 

Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.

1
Mon Dec 28, 2015, 4:08 pm

Building facade facing circulation network not more than 1ft

ND-v4 NPDc1:Walkable streets
posted by  Kristina Pobre  on 

I'm a bit confused with why LEED ND is putting a point on this specific criteria.

0