Forum quick links
Alternative HVAC duct sealant
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by John Covello on
Hi, My contractor is proposing and alternative method to sealing the air conditioning ducts. They would like to use a foam for the duct end that would be air tight.
Venlilation Spaces Only
NC-2009 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear All:- Our project have ventilation spaces only (No A/c spaces) so how we model these building in energy model As per LEED Missing manual we follow below things "Assign HVAC systems as per Ap
LEED-GA as a student
posted by PRATIK KUMAR on
Hello everyone, Kindly help me out in providing a proper knowledge about LEED-GA exams as a student. As i am a working professional and doing my PG-Diploma in Urban planning as part time,and also i
Purchasing RECs for Projects with District Cooling
CS-2009 EAc6:Green powerposted by Katherine Ann Resurreccion on
Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling.
Tile finishes for flat roof
CS-2009 SSc7.2:Heat island effect - roofposted by Magda Aghababyan on
We are working project C&S the client need to use white colour ceramic tile on roof top.Should need to test it ? and value has to be more than 78 for the flat roof ?
Blind
CI-v4 EQc5:Thermal comfortposted by Ameet AA on
Hi, Can blind be considered as control for thermal comfort? Thanks.
District Co generation Plantby
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by satheesh M on
Hi, The building is catered by own chiller plant located in the building & building owned DES Cogeneration plant for the space cooling.
Storm water calculation
CS-2009 SSc6.1:Stormwater design - quantity controlposted by Magda Aghababyan on
Hi, We are working in project previously land was empty top soil is hard and when calculating Pre-development
100% outdoor air indirec evaporative cooling system
NC-2009 EAp2:Minimum energy performanceposted by BEE Incorporations on
Hi everybody, The project is a garment factory. We are modeling a 100% outdoor air IEC system for the proposed case. And the system 8 (VAV with PFP Boxes) is modeled in the baseline case.
Building facade facing circulation network not more than 1ft
ND-v4 NPDc1:Walkable streetsposted by Kristina Pobre on
I'm a bit confused with why LEED ND is putting a point on this specific criteria.