CS-2009 SSc5.2:Site development - maximize open spaceposted by Paul Deinhofer on
I'm working on a CS project (v2009) and I have a question concerning the definition of vegetated areas/roofs and the compliance with SSc5.2, SSc7.1, SSc7.2, etc.: Do ruderal vegetation areas (so no
Connected underground car parks
NC-v4 LTc7:Reduced parking footprintposted by Florian Schmidtchen on
Dear all. We are working on a LEED v4 NC campus project in which two (office) buildings pursuing a LEED certification.
Irrigation type definitions
NC-v4 WEp1:Outdoor water use reductionposted by Jens Apel on
Does anyone know if there are definitions for the different irrigation types? Especially the differences between the two drip types would be of interested. Thanks, Jens
changes in appealed credit
posted by Emmanuel Pauwels on
We have appealed the EAP2 credit succesfully in design phase. Now we are ready to submit for the construction review, but there are some changes in the EAP2 credit. How should we proceed?
20 or More Basic Services - Innovation Credit?
CS-2009 SSc2:Development density and community connectivityposted by Ian McCall on
Hello, Is it possible to get an innovation credit for projects that have 20 or more basic services (that are different)? Regards, Ian
Calculation grid for option 2
NC-v4 EQc7:Daylightposted by Sarah Leenknegt on
Hi, Regarding option 1, there are clear requirements to the calculation grid and evaluation plane. Do the same requirements apply for option 2? Thanks! Sarah
C&S or NC ?
posted by Claire PIMET on
I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project.
Brownfield remediation
NC-v4 LTc3:High priority siteposted by Florian Schmidtchen on
In Germany the (property) owner has to arrange inquiries regarding the soil pollution and burden by weapons, explosive ordnance and combat equipment (military hazardous waste).
calculation of material cost
NC-2009 MRc5:Regional materialsposted by Doreen Kruschina on
Hi, in every LEED Project we do struggle in obtaining the material costs as many companies refuse to split their invoices in those for material and those for labour. Question is whether the assumpt
Door arrest systems or free-swinging closers allowed?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Is it allowed to install additional door arrest systems or free-swinging closers to the self-closing doors, so that in case the occupant is able to keep the door open for a short period?