Forum quick links
Projects in Europe may use the values defined by EU standards?
CI-2009 WEp1:Water use reductionposted by Michael Smithing on
Does anyone have any idea what these standards are or where they can be found? The European water label gives its highest rating (Green) to WC taps with a flow of 6 liter/minute or less.
Operable windows -ground floor or upperfloor?
NC-v4 EQp2:Environmental tobacco smoke controlposted by Florian Schmidtchen on
Dear Sir or Madam, Smoking must be prohibited within 25 feet of building entries, outdoor air intakes, and operable windows.
calculation of material cost
NC-2009 MRc5:Regional materialsposted by Doreen Kruschina on
Hi, in every LEED Project we do struggle in obtaining the material costs as many companies refuse to split their invoices in those for material and those for labour. Question is whether the assumpt
Door arrest systems or free-swinging closers allowed?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Is it allowed to install additional door arrest systems or free-swinging closers to the self-closing doors, so that in case the occupant is able to keep the door open for a short period?
certified projects
posted by Bernadette Stauder-Buschlinger on
certified projects are still displayed and accessible at the new LEED Online?
Green walls
NC-v4 WEc1:Outdoor water use reductionposted by Julien Richard on
Hi, Do we have to include green walls in the calculation ?
Global Compliance Paths EN 15251
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Elodie DUMAS on
Hi, There's several quality level for interior air in EN 15251 : category I to III.
LTc4- Long-term bicycle storage, Bicycle maintenance program
Retail-CI-v4 LTc4:Bicycle facilitiesposted by Valentin Grimaud on
Hi, I am working on a store located on the groung floor of a mall.
Outdoor Airflow Measurement Device in AHUs
Schools-2009 IEQc1:Outdoor air delivery monitoringposted by Thomas Kohmann on
There are a few AHUs in the project for which I work. One AHU supplies less than 20% of the non-densely-occupied rooms with its air volume flow, but still has outdoor airflow measurement devices.
BD+C Major Renovation or O+M Existing Buildings
posted by Catherine Verdier on
Hello, The project I am working on is an existing office building, that will undergo renovation works and will have its entrance hall extended (the extension will be a little more than 1,000 sf).