Forum quick links
Radius
NC-v4 LTc4:Surrounding density and diverse usesposted by Sylvia Renes on
Hi, How does a 1/4 mile radius around the project site from the project boundary looks like?
CS appendix 1: default occupancy counts
NC-2009 PIf3:Occupant and Usage Dataposted by Bernadette Stauder-Buschlinger on
The project is a restaurant within a high rise office building. My question is: What is the correct gross square feet per FTE OR EMPLOYEE.
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water use reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
SS PC27 - a short feedback
CS-2009 IDc1:Innovation in designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning LEED SS PC 27 use for a major refurbishment office project in France, under LEED for Core an Shell version 3. This Pilot Credit was aim
Shower in Units of gpc or USgpm in Form WEp1
CS-2009 WEp1:Water use reductionposted by Panagiota Dadinou on
Hello, a question concerning WEp1 Could I use the flow rate in Units of gallons per cycle (gpc) instead of USgallons per minute (USgpm) for the Shower as Fixture Family in Table WEp1-4.Flow Fixt
Conditions for site fence
NC-2009 SSp1:Construction activity pollution preventionposted by Julian Bork on
Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th
Elevator lobbies -with airlocks?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Dear all, We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention.
Development Density Calculations
CS-2009 SSc2:Development density and community connectivityposted by Amanda Johnson on
For the Development Density calculations our project has an 880 ft DD radius .
Certify only one floor among three floors that are rented
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Diana Nezamutinova on
Would you please advise if one newly acquired floor of a 3-floor office eligible to get certified under LEED v.4 Commercial Interiors (see details below)? - A company XYZ has been renting 2 adjac