Forum quick links
All or the Main street frontages 1:1.5
Pilot-Credits PC14:Walkable Streetsposted by Ian McCall on
Dear All, The PC 14 credit description states that “All street frontages have a minimum building-height-to-street center-line ratio of 1:1.5”.
Sound transmission for moveable partitions
NC-v4 EQc9:Acoustic performanceposted by Anaïs P on
Do the requirements about sound transmission have to be applied for moveable partitions in open-plan office? Achieving the STC values from table 1 betweeen two standards offices separated by a move
Extent of European ACP application
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jens Apel on
I am not quite sure on the wording regarding natural ventilation and the Europe ACP. The online Ref.Guide states "Projects in Europe may use Arbeitsstaettenrichtlinie ASR 5 as a local equivalent to
Fertilizer and Herbicide Use
EBOM-v4 SSp1:Site management policyposted by David ESPAGNET on
In the site Management Policy (and SSc5 Credit) soil testing requirement have been added since 2009.
Conditions for site fence
NC-2009 SSp1:Construction activity pollution preventionposted by Julian Bork on
Hello everybody I have a question about the construction fence as a part of the ESC plan: is there a minimum height for closing or covering the fence with tarpaulins to avoid wind erosion? Many th
Radius
NC-v4 LTc4:Surrounding density and diverse usesposted by Sylvia Renes on
Hi, How does a 1/4 mile radius around the project site from the project boundary looks like?
CS appendix 1: default occupancy counts
NC-2009 PIf3:Occupant and Usage Dataposted by Bernadette Stauder-Buschlinger on
The project is a restaurant within a high rise office building. My question is: What is the correct gross square feet per FTE OR EMPLOYEE.
Number of sampling location
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Caroline PIN on
Dear all, Does anyone know if there is an ACP rule for sampling points for the air quality tests.
Coffee Room Fixture Flow Rate?
NC-2009 WEp1:Water use reductionposted by Ian McCall on
Hello, From what I can tell coffee room water fixtures (used for washing coffee cups and hands) in open office spaces are to be included in the credit.
SS PC27 - a short feedback
CS-2009 IDc1:Innovation in designposted by Elodie DUMAS on
Dear all, A short feedback about our experience concerning LEED SS PC 27 use for a major refurbishment office project in France, under LEED for Core an Shell version 3. This Pilot Credit was aim